AD - Fermi Project Task Structure Details - Project 20 Open
Tasks |
Time run: 7/7/2023
1:16:15 PM |
|
|
|
Chargeable
Flag is equal to Y |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
and |
Project
Number is equal to 20 ,
202 , 200 , 201 , 203 , 204 , 204FI , 204IRA
, 205 , 20A , 20B , 20C , 20E , 20F , 20G , 20JA , 20JB , 20JC ,
20JD , 20JE , 20LF , 20MA ,
20MB , 20NA , 20NB , 20R , 20SPS , 2103 , 2103A
, 2104 , 2105 , 2106 , 2107 ,
2108 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
and |
Service Type
Code is not equal to / is not in PARENT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Number |
Project Name |
Task Number |
Chargeable Flag |
Procard Flag |
Start Date |
Completion Date |
Task Name |
Long Task Name |
Description |
Organization Name |
Fund Type |
B&R Type |
BNR Code |
Service Type Desc |
Service Type Code |
Thrust Category |
Thrust Name |
Activity |
Functional Cost Code |
Creation Date |
Last Update Date |
20 |
ACCELERATOR DIVISION |
20.00.00.02 |
Y |
N |
27-Sep-2008 |
|
UNREPORTED EFFORT |
UNREPORTED EFFORT |
This is a temporary holding
account to be used for effort associated with timecards which are entered by
anyone other than the employee. Employees are required to submit a revised
timecard/effort report to clear the charges from this task. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021 INTENSITY FACILITIES
- ACCELERATOR OPERATIONS |
OP-EXST PRGM OP-ACCEL |
AccelOperations |
Accelerator Operations |
Accelerator Operations General |
C20 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.01 |
Y |
N |
27-Sep-2008 |
|
ADMIN SUPPORT |
ADMIN SUPPORT |
Includes
personnel costs associated with administrative support services positions.
Effective 9/25/17 this task is only accessible by default salary P/T
assignment or by special arrangement with the approval of the AD Senior FFM. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.08 |
Y |
N |
27-Sep-2008 |
|
NTW INFR SUPP |
NTW INFR SUPP |
Includes EFFORT
related to planning, design & deployment of site-wide network
infrastructure: monitoring & evaluating network performance &
security, maintenance, debugging & diagnostics, capacity planning, &
central network infrastructure upgrades. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Site Networking |
A9 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.10 |
Y |
N |
27-Sep-2008 |
|
CONF/WKS ORG |
CONF/WKS ORG |
Includes
TECHNICAL effort associated with service on conference organizing committees
and/or coordination of physics workshops/seminars which are primarily related
to some aspect of Accelerator Operations. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Conference
Organization |
C20 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.11 |
Y |
N |
27-Sep-2008 |
|
AD WORKSTATION SUPPT |
AD WORKSTATION
SUPPT |
Includes Local
Admin effort related to providing workstation hardware & software support
services for AD-owned machines. Individuals supporting their own machine(s)
should use their home salary P/T or an approriate program support P/T. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.12 |
Y |
N |
27-Sep-2008 |
|
ES&H, ENVIRONMENTAL |
ES&H,
ENVIRONMENTAL |
Includes effort
associated with the development, implementation and maintenance of effluent
controls, environmental monitoring and surveillance, permitting, auditing and
evaluation to assure environmental compliance and pollution prevention. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
ESH&Q |
Environmental
Services |
B10 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.28 |
Y |
N |
27-Sep-2008 |
|
QA, IQA PROGRAM |
QA, IQA PROGRAM |
Includes effort
associated with activities related to formulating and implementing Fermilab's
Integrated Quality Assurance Program. May also be used for M&S associated
with AD contract hires. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
ESH&Q |
Quality Assurance
Program |
B17 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.49 |
Y |
N |
29-Sep-2009 |
|
CONF ORG ADMIN |
CONF ORG ADMIN |
Includes
ADMINISTRATIVE effort associated with services provided in support of
conferences and/or workshops. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Business
Operations |
Conference
Organization |
B19 |
19-Feb-2010 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.53 |
Y |
N |
29-Sep-2010 |
|
PROCUREMENT SERVICES |
PROCUREMENT
SERVICES |
Includes
personnel costs associated with procurement services positions. Effective
9/25/17 this task is only accessible by default salary P/T assignment or by
special arrangement with the approval of the AD Senior FFM. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Procurement
Services |
B19 |
29-Apr-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.54 |
Y |
N |
20-Sep-2010 |
|
INSTR |
INSTR |
Includes effort
associated with general purpose instrumentation and beam diagnostics in
support of accelerator operations. May also be used for M&S associated
with AD contract hires. Replaces 20.00.01.20. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
02-Jun-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.55 |
Y |
N |
20-Sep-2010 |
|
INSTR, MAINT |
INSTR, MAINT |
Includes effort
associated with instrumentation maintenance (preventive, predictive or
corrective) in support of accelerator operations. May also be used for
M&S associated with AD contract hires. Replaces 20.00.01.21. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
B13 |
02-Jun-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.61 |
Y |
N |
29-Sep-2011 |
|
AD SERVER SUPPORT |
AD SERVER SUPPORT |
Includes AD
server support effort: central computing services (web, print, calendars,
mailists, backup), central server operations, and Linux, Mac OSX &
Windows foundation services (upgrades, patching, inventory, configuration
management, antivirus). |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Core IT Services |
A9 |
21-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.66 |
Y |
Y |
29-Sep-2011 |
|
EDUC/OUTR ACTIVITIES |
EDUC/OUTR
ACTIVITIES |
Includes effort
& travel associated with internships & educational outreach programs
& committees (SIST, IPM, Bardeen Fellowship, Fermilab's Mentorship
Program, PhD student mentorship, thesis defense, Ask A Scientist, etc.) and
public affairs events. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Executive
Management/COO |
Communication /
Education / Public Outreach |
A8 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.67 |
Y |
N |
29-Sep-2011 |
|
BUDGET & FINANCIAL |
BUDGET &
FINANCIAL |
Includes
personnel costs associated with budget and financial service positions.
Effective 9/25/17 this task is only accessible by default salary P/T
assignment or by special arrangement with the approval of the AD Senior FFM. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Executive
Management/COO |
Financial
Management |
A7 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.69 |
Y |
N |
29-Sep-2011 |
|
MGT & OS |
MGT & OS |
Includes
personnel costs associated with management and oversight activities.
Effective 9/25/17 this task is only accessible by default salary P/T
assignment (Group Leaders or higher) or by special arrangement with the
approval of the AD Senior FFM. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.70 |
Y |
Y |
29-Sep-2011 |
|
REV/COM SERV, EXT |
REV/COM SERV, EXT |
Includes effort
associated with service on external reviews of non-Fermilab projects,
programs and activities, journal referee or editor activities, proposal peer
review and national service. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Business
Operations |
External Reviews
and Committees |
B19 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.71 |
Y |
Y |
29-Sep-2011 |
|
REV/COM SERV, INT |
REV/COM SERV, INT |
Includes effort
related to service on/organizing of lab-wide committees not specific to core
mission (e.g. records management, EVMS, engineering task force) and reviews
of Fermilab projects, programs and activities. Use 20.00.01.28 for IQA
Program. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Business
Operations |
Internal Reviews
and Committees |
B19 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.72 |
Y |
N |
29-Sep-2011 |
|
LLRF TECH UG DES SWF |
LLRF TECH UG DES
SWF |
Includes effort
associated with LLRF System next generation design development. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
30-Aug-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.73 |
Y |
N |
29-Sep-2011 |
|
SHLD ASS & MODS SWF |
SHLD ASS &
MODS SWF |
Includes effort
associated with shielding assessments and modifications. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
12-Sep-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.77 |
Y |
N |
27-Sep-2012 |
|
VAC, GEN ENGR SUPP |
VAC, GEN ENGR
SUPP |
Includes effort
and contract hire costs associated with the acquisition and maintenance of
vacuum system equipment, tools and supplies, i.e. leak detectors,
vacuum/scroll pumps, turbos, RGA's, etc. Use 20.15.01.07 for related M&S. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
01-Jul-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.78 |
Y |
N |
27-Sep-2012 |
|
ACC PS DEV SWF |
ACC PS DEV SWF |
Includes effort
associated with accelerator power supply R&D initiatives which are not
specific to a particular accelerator, beamline, project or R&D program,
including that associated with contract hires. Use 20.07.1.2.17 for
associated M&S. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
06-Aug-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.80 |
Y |
N |
26-Sep-2013 |
|
FLUIDS, GES |
FLUIDS, GES |
Includes effort
associated with providing general engineering support for accelerator and
beamline fluids systems. May also be used for M&S associated with AD
contract hires. Replaces 20.00.01.41. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
11-Oct-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.01.86 |
Y |
N |
26-Sep-2013 |
|
IARC FACIL OPS SWF |
IARC FACIL OPS
SWF |
Includes effort
associated with IARC facility OTE (Office, Technical and Education building,
HAB Heavy Assembly Building) operations and maintenance. |
AD - OPERATIONS EFFORT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Facilities
Management |
IARC - Illinois
Accelerator Research Center |
B13 |
29-Jul-2014 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.02.01 |
Y |
N |
27-Sep-2008 |
|
ACCELERATOR OPS |
ACCELERATOR OPS |
Includes
ACCELERATOR OPERATIONS DEPARTMENT personnel costs. Effective 9/25/17 this
task is only accessible by default salary P/T assignment or by special
arrangement with the approval of the AD Senior FFM. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.02.03 |
Y |
Y |
29-Sep-2011 |
|
ACCEL OPS GEN'L |
ACCEL OPS GEN'L |
Includes EFFORT,
contract hire costs (M&S) and travel associated with accelerator
operations and maintenance which benefits more than one accelerator system,
beamline or operations activity, and for which a more specific task does not
exist. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.05.01 |
Y |
N |
27-Sep-2008 |
|
COMMON ACC CONTROLS |
COMMON ACC
CONTROLS |
Includes effort
associated with activities in support of operations. May also be used for
M&S associated with AD contract hires. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.14.01.01 |
Y |
N |
27-Sep-2008 |
|
MI, OPERATIONS |
MI, OPERATIONS |
Includes effort
associated with supporting Main Injector operations. May also be used for
M&S associated with contract hires. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.14.01.02 |
Y |
N |
27-Sep-2008 |
|
MI, MAINTENANCE |
MI, MAINTENANCE |
Includes effort
assoc. with maint. activities (preventive, predictive or corrective)
performed to sustain or continue existing Main Injector property and equip.
in a usable condition. May also be used for M&S associated with contract
hires. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
B13 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.14.01.04 |
Y |
N |
26-Sep-2013 |
|
MIRF 250 kW MOD R&D |
MIRF 250 kW MOD
R&D |
Includes effort
related to design, construction & testing of a prototype ~ 250kW
modulator for the MI RF system capable of operating two existing 150kW PA's
on an existing MIRF cavity (push pull operation) or a single ~250kW PA
mounted to the cavity. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
17-Jan-2014 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.14.02.01 |
Y |
N |
27-Sep-2008 |
|
RR, OPERATIONS |
RR, OPERATIONS |
Includes effort
associated with supporting Recycler Ring operations. May also be used for
M&S associated with contract hires. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.14.02.02 |
Y |
N |
27-Sep-2008 |
|
RR, MAINTENANCE |
RR, MAINTENANCE |
Includes effort
assoc. with maint. activities (preventive, predictive or corrective)
performed to sustain or continue existing RR property and equip. in a usable
condition. May also be used for M&S associated with contract hires. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
B13 |
31-Aug-2009 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.14.02.04 |
Y |
N |
26-Sep-2013 |
|
RRRF CWRF CAV R&D |
RRRF CWRF CAV
R&D |
Includes effort
associated with the design, construction and testing of a prototype
continuous operation (CW) RF Cavity for the Main Injector Recycler RF system. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
17-Jan-2014 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.14.02.05 |
Y |
N |
29-Sep-2013 |
|
RRRF HPRF TUNER R&D |
RRRF HPRF TUNER
R&D |
Includes effort
associated with the design, construction and testing of a prototype High
Power RF Tuner for the Main Injector Recycler RF system CW RF Cavity. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
17-Jan-2014 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.02.20.04 |
Y |
N |
29-Sep-2010 |
|
TEV, DECOMMISSIONING |
TEV,
DECOMMISSIONING |
Includes effort
associated with Tevatron decommissioning activities. May also be used for
M&S associated with contract hires. |
AD - OPERATIONS EFFORT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Tevatron |
C20 |
06-Jul-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.05.03 |
Y |
Y |
26-Sep-2015 |
|
IF SCI-EXP INITS |
IF SCI-EXP INITS |
Includes
scientist effort and travel associated with Intensity Frontier experimental
and research initiatives such as new proposals for the Fermilab PAC or work
associated with the development of next generation concepts. |
AD - OPERATIONS EFFORT |
OPERATING |
R&D |
KA220102 |
KA 22 01 02
INTENSITY RESEARCH - NATIONAL LABORATORIES |
OP-R&D-INTENSITY |
IntensityFront_Neutrino |
Intensity-General |
Intensity Frontier
General |
C20 |
04-Aug-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.05.05 |
Y |
Y |
26-Sep-2015 |
|
IF SCI-DUNE RESEARCH |
IF SCI-DUNE
RESEARCH |
Includes
scientist effort and travel associated with the DUNE Collaboration and
Experiment. |
AD - OPERATIONS EFFORT |
OPERATING |
R&D |
KA220102 |
KA 22 01 02
INTENSITY RESEARCH - NATIONAL LABORATORIES |
OP-R&D-INTENSITY |
IntensityFront_Neutrino |
DUNE |
LBNE - Long
Baseline Neutrino Experiment |
C20 |
04-Aug-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.05.08 |
Y |
Y |
26-Sep-2015 |
|
IF SCI-Mu2e RESEARCH |
IF SCI-Mu2e
RESEARCH |
Includes
scientist effort and travel associated with the Mu2e Collaboration and
Experiment. |
AD - OPERATIONS EFFORT |
OPERATING |
R&D |
KA220102 |
KA 22 01 02
INTENSITY RESEARCH - NATIONAL LABORATORIES |
OP-R&D-INTENSITY |
IntensityFront_Muon |
Mu2e |
Mu2e - Muon to
Electron Conversion Experiment |
C20 |
04-Aug-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.05.10 |
Y |
Y |
26-Sep-2015 |
|
IF SCI-MUON g-2 |
IF SCI-MUON g-2 |
Includes
scientist effort and travel associated with the Muon g-2 Collaboration and
Experiment. |
AD - OPERATIONS EFFORT |
OPERATING |
R&D |
KA220102 |
KA 22 01 02
INTENSITY RESEARCH - NATIONAL LABORATORIES |
OP-R&D-INTENSITY |
IntensityFront_Muon |
Muon g-2 |
g-2 |
C20 |
04-Aug-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.05.11 |
Y |
Y |
26-Sep-2015 |
|
IF SCI-NOvA XP |
IF SCI-NOvA XP |
Includes
scientific effort and travel associated with the NOvA Experiment: shifts,
collaboration meetings, publications, etc. |
AD - OPERATIONS EFFORT |
OPERATING |
R&D |
KA220102 |
KA 22 01 02
INTENSITY RESEARCH - NATIONAL LABORATORIES |
OP-R&D-INTENSITY |
IntensityFront_Neutrino |
NOvA |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
04-Aug-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.00.05.12 |
Y |
Y |
26-Sep-2019 |
|
IF SCI-SBN XP |
IF SCI-SBN XP |
Includes
scientific effort and travel associated with the SBN Experiment: shifts,
collaboration meetings, publications, etc. |
AD - OPERATIONS EFFORT |
OPERATING |
R&D |
KA220102 |
KA 22 01 02
INTENSITY RESEARCH - NATIONAL LABORATORIES |
OP-R&D-INTENSITY |
IntensityFront_Neutrino |
SBN Research |
SBN |
C20 |
04-Nov-2019 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.02.1.1.1 |
Y |
Y |
02-Jul-1974 |
|
AD ACCEL. DIV OPER. |
AD ACCEL. DIV
OPER. |
ACCELERATOR
OPERATIONS |
AD - ACCELERATOR OPERATIONS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.02.14.40.04 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW MAINT-OPS |
DSKT HW MAINT-OPS |
Includes M&S
costs associated with desktop hardware maintenance and repairs. Maintenance
and repair costs associated with systems which are deployed primarily as
engineering tools, such as CAD systems, should not be charged to this task. |
AD - ACCELERATOR OPERATIONS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.02.14.40.06 |
Y |
Y |
01-Oct-2006 |
|
GP SUPP & EQ-ACC OPS |
GP SUPP &
EQ-ACC OPS |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. |
AD - ACCELERATOR OPERATIONS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.02.14.41 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW/SW-OPS |
DSKT HW/SW-OPS |
Includes desktop
hardware (computers, printers, keyboards, etc.), desktop software licenses
and annual software maintenance. Does not include engineering and design
software licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d,
etc. |
AD - ACCELERATOR OPERATIONS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.02.14.50 |
Y |
Y |
29-Sep-2010 |
|
PROF DEV-ACCEL OPER |
PROF DEV-ACCEL
OPER |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - ACCELERATOR OPERATIONS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
03-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.01.01 |
Y |
Y |
29-Sep-2010 |
|
CENTRAL SRV-CONTROLS |
CENTRAL
SRV-CONTROLS |
Includes M&S
costs associated with accelerator controls central server hardware and
software, except those related to hardware (20.05.01.05) and software
(20.05.01.06) maintenance. Replaces the 20.05.1.2.600.xx task series
beginning in FY2012. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.01.02 |
Y |
Y |
29-Sep-2010 |
|
CONSOLES-CONTROLS |
CONSOLES-CONTROLS |
Includes M&S
costs associated with accelerator controls console hardware and software,
except those related to hardware (20.05.01.05) and software (20.05.01.06)
maintenance. Replaces the 20.05.1.2.602.xx task series beginning in FY2012. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.01.03 |
Y |
Y |
29-Sep-2010 |
|
FIELD SYST-CONTROLS |
FIELD
SYST-CONTROLS |
Includes M&S
costs associated with accelerator controls field system hardware and
software, except those related to hardware (20.05.01.05) and software
(20.05.01.06) maintenance. Replaces the 20.05.1.2.605.xx task series
beginning in FY2012. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.01.04 |
Y |
Y |
29-Sep-2010 |
|
FE SYSTEMS-CONTROLS |
FE
SYSTEMS-CONTROLS |
Includes M&S
costs associated with accelerator controls front-end system hardware and
software, except those related to hardware (20.05.01.05) and software
(20.05.01.06) maintenance. Replaces the 20.05.1.2.603.xx task series
beginning in FY2012. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.01.05 |
Y |
Y |
29-Sep-2010 |
|
HW MAINT-CONTROLS |
HW MAINT-CONTROLS |
Includes
hardware maintenance costs associated with accelerator controls systems
hardware, including central servers, consoles, field systems and front-end
systems. Replaces the 20.05.1.2.606.xx task series beginning in FY2012. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
B13 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.01.06 |
Y |
Y |
29-Sep-2010 |
|
SW MAINT - CONTROLS |
SW MAINT -
CONTROLS |
Includes
software maintenance costs associated with accelerator controls systems
software. Replaces the 20.05.1.2.607.xx task series beginning in FY2012. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.01.07 |
Y |
Y |
01-Feb-2020 |
|
5G ADV W/L TECH R&D |
5G ADV W/L TECH
R&D |
Includes costs
associated with 5G advanced wireless technologies R&D |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
R&D |
KA2201040 |
KA 22 01 04
INTENSITY RESEARCH - PRE-CONCEPT DESIGN & RESEARCH |
OP-R&D-INTENSITY-PRE
CNCPT DES |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
10-Mar-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.01.08 |
Y |
Y |
26-Sep-2018 |
|
CONTROLS SYSTM MODRN |
CONTROLS SYSTM
MODRN |
Includes M&S
and Effort Associated with the controls systems modernization plan. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
19-Feb-2019 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.02.01 |
Y |
Y |
29-Sep-2010 |
|
CORE IT HARDWARE |
CORE IT HARDWARE |
Includes M&S
costs for core IT hardware (servers, storage, UPS, etc.) except associated
with hardware maintenance. Use 20.05.02.02 for core IT hardware maintence
costs. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Core IT Services |
A9 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.02.02 |
Y |
Y |
29-Sep-2010 |
|
CORE IT HW MAINT |
CORE IT HW MAINT |
Includes
hardware maintenance costs for core IT hardware, i.e. Equalogic, Quantum tape
drives, UPS, printers, etc. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Core IT Services |
B13 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.02.03 |
Y |
Y |
29-Sep-2010 |
|
CORE IT SW MAINT |
CORE IT SW MAINT |
Includes
software licenses and annual software maintenance costs for core IT software,
i.e. Event Sentry, Symantec AntiVirus, Symantec SRM, Symantec Veritas, etc. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Core IT Services |
A9 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.02.04 |
Y |
Y |
29-Sep-2010 |
|
CORE IT SUPPLIES |
CORE IT SUPPLIES |
Includes M&S
costs for core IT supplies, i.e. printer supplies, backup tapes, etc. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Core IT Services |
A9 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.03.01 |
Y |
Y |
29-Sep-2010 |
|
DESKTOP PC PARTS |
DESKTOP PC PARTS |
Includes M&S
costs for desktop PC parts, i.e. memory, video cards, mother boards,
batteries, mice, keyboards, etc. Replaces 20.05.14.4 beginning in FY2012. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.03.02 |
Y |
Y |
29-Sep-2010 |
|
DESKTOP SW MAINT |
DESKTOP SW MAINT |
Includes
software licenses and annual software maintenance costs for centrally managed
desktop software, i.e. Diskkeeper, FileMaker, Mac OSX, Microsoft EA, NFS,
Symantec Ghost, etc. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.04.01 |
Y |
Y |
29-Sep-2010 |
|
NTW CABLING & SUPP |
NTW CABLING &
SUPP |
Includes M&S
costs related to site-wide network cabling: cable installation, testing
tools, and parts and cables for interconnecting central networking devices
(firewalls, routers, network monitors) and establishing fiber paths to remote
buildings. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Site Networking |
A9 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.04.02 |
Y |
Y |
29-Sep-2010 |
|
NTW HW MAINT |
NTW HW MAINT |
Includes M&S
costs associated with site-wide network hardware maintenance including
firewalls, routers, VPN, Domain Name service and central UPS and devices. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Site Networking |
B13 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.04.04 |
Y |
Y |
29-Sep-2010 |
|
NTW SW MAINT |
NTW SW MAINT |
Includes M&S
costs associated with site-wide network software licenses and annual software
maintenance including firewalls, network packet capture and analysis,
X-protect video and trouble-shooting software. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Site Networking |
A9 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.04.05 |
Y |
Y |
29-Sep-2010 |
|
NTW HARDWARE |
NTW HARDWARE |
Includes M&S
costs for network appliances required to conduct site-wide network
monitoring, diagnostics and packet capture, and hardware associated with EOL
replacement of firewalls, routers, VPN and central network and distribution
switch hardware. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Site Networking |
A9 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.05.01 |
Y |
Y |
29-Sep-2010 |
|
ENG TLS-CONTROLS |
ENG TLS-CONTROLS |
Includes M&S
costs associated with the acquisition of engineering tools and instruments
and associated software, licenses and annual software maintenance. Replaces
20.05.12.5 beginning in FY2012. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Controls & Instrumentation |
B19 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.05.02 |
Y |
Y |
29-Sep-2010 |
|
ENG TLS HW MAIN-CONT |
ENG TLS HW
MAIN-CONT |
Includes
hardware maintenance costs associated with engineering tools and instruments. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Controls & Instrumentation |
B13 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.06.01 |
Y |
Y |
29-Sep-2010 |
|
FLEET & LOGISTICS |
FLEET &
LOGISTICS |
Includes M&S
associated with materials handling, and fleet and forklift operations,
including leased vehicles. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Transportation,
Distribution, Fleet |
B16 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.07.01 |
Y |
Y |
29-Sep-2010 |
|
FIRUS OPERATIONS |
FIRUS OPERATIONS |
Includes M&S
and Effort associated with FIRUS (FIRe and Utility System), a site-wide alarm
system which reports alleged fires, power failures, pump alarms, etc. The MCR
FIRUS screen reports only problems relevant to the division. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
ESH&Q |
Safety Services |
B11 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.14.40.04 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW MAINT-CONT |
DSKT HW
MAINT-CONT |
Includes desktop
hardware maintenance and repair costs. Maintenance and repair costs
associated with systems which are deployed primarily as engineering tools,
such as CAD systems, should not be charged to this task. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.14.40.06 |
Y |
Y |
01-Oct-2006 |
|
GP SUPP & EQ-CNTRLS |
GP SUPP &
EQ-CNTRLS |
Includes general
purpose supplies and equipment in support of Controls Department personnel -
copiers, mobile phones, pagers, water, paper goods, office supplies, etc. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.14.41 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW/SW-CONT |
DSKT HW/SW-CONT |
Includes costs
for desktop hardware, desktop software licenses and annual maintenance for
Controls Dept. personnel. Does not include engineering and design software
licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d, etc. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.14.50 |
Y |
Y |
29-Sep-2010 |
|
PROF DEV-CONTROLS |
PROF DEV-CONTROLS |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
03-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.99.03 |
Y |
Y |
29-Sep-2010 |
|
PC SUSPENSE-KUCERA |
PC
SUSPENSE-KUCERA |
PROCARD SUSPENSE
/ M KUCERA |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.99.05 |
Y |
Y |
29-Sep-2010 |
|
PC SUSPENSE-SMEDINGH |
PC
SUSPENSE-SMEDINGH |
PROCARD SUSPENSE
/ J SMEDINGHOFF |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
04-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.99.07 |
Y |
Y |
26-Sep-2013 |
|
PC SUSP-D McARTHUR |
PC SUSP-D
McARTHUR |
PROCARD SUSPENSE
/ D McARTHUR |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
02-May-2014 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.05.99.08 |
Y |
Y |
26-Sep-2015 |
|
PC SUSPENSE-SANCHEZ |
PC
SUSPENSE-SANCHEZ |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - ACCELERATOR CONTROLS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
19-Oct-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.13 |
Y |
Y |
24-Nov-2003 |
|
PS MAINT-PROT SRC |
PS MAINT-PROT SRC |
POWER SUPPLY
MAINTENANCE-PROTON SOURCE |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.14 |
Y |
Y |
24-Nov-2003 |
|
PS MAINT-RR |
PS MAINT-RR |
POWER SUPPLY
MAINTENANCE-RECYCLER RING |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
B13 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.16 |
Y |
Y |
29-Sep-2011 |
|
FLEET & LOGISTICS |
FLEET &
LOGISTICS |
Includes M&S
associated with materials handling, and fleet and forklift operations. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Transportation,
Distribution, Fleet |
B16 |
15-Dec-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.17 |
Y |
Y |
27-Sep-2012 |
|
ACC PS DEV M&S |
ACC PS DEV
M&S |
Includes M&S
associated with accelerator power supply R&D initiatives which are not
specific to a particular accelerator, beamline, project or R&D program.
Use 20.00.01.78 for associated effort, including effort associated with
contract hires. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
06-Aug-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.18 |
Y |
Y |
26-Sep-2014 |
|
PS MAINT-MS |
PS MAINT-MS |
Includes M&S
costs associated with Muon Source power supply maintenance. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
B13 |
26-Mar-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.19 |
Y |
Y |
26-Sep-2019 |
|
GEN PURPOSE PARTS |
GEN PURPOSE PARTS |
Includes M&S
costs for commonly used general purpose parts required to maintain
accelerator and beamline complex equipment. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
27-Apr-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.2 |
Y |
Y |
05-Dec-1995 |
|
DES / DRFT SUPPLIES |
DES / DRFT
SUPPLIES |
Includes M&S
costs associated with design/drafting services: contract document scanning
services, print scanner maintenance and supplies, prototype PC cards,
drafting materials and lettering machine supplies. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.20 |
Y |
Y |
26-Sep-2019 |
|
GEN PURPOSE EQUIP |
GEN PURPOSE EQUIP |
Includes M&S
costs for tech shop and test equipment required to perform maintenance and
surveillance across the accelerator and beamline complex. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
27-Apr-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.4 |
Y |
Y |
05-Dec-1995 |
|
PS MAINT-MI |
PS MAINT-MI |
POWER SUPPLY
MAINTENANCE-MAIN INJECTOR |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
B13 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.1.2.7 |
Y |
Y |
15-Jan-1997 |
|
PS MAINT-BL |
PS MAINT-BL |
POWER SUPPLY
MAINTENANCE-BEAM LINES |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
B13 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.10.06 |
Y |
Y |
26-Sep-2019 |
|
WIP CE 40Apk PS |
WIP CE 40Apk PS |
Includes M&S
and EFFORT associated with constructing correction element 40Apk power
supplies. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
16-Jul-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.14.40.04 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW MAINT-EES |
DSKT HW MAINT-EES |
Includes M&S
costs associated with desktop hardware maintenance and repairs. Maintenance
and repair costs associated with systems which are deployed primarily as
engineering tools, such as CAD systems, should not be charged to this task. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.14.40.06 |
Y |
Y |
01-Oct-2006 |
|
GP SUPP & EQ-EE SUPP |
GP SUPP &
EQ-EE SUPP |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.14.41 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW/SW-EES |
DSKT HW/SW-EES |
Includes desktop
hardware (computers, printers, keyboards, etc.), desktop software licenses
and annual software maintenance. Does not include engineering and design
software licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d,
etc. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.14.45 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS-EES |
ENG TLS-EES |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.14.46 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS HW MT-EES |
ENG TLS HW MT-EES |
Includes
hardware maintenance costs associated with engineering, design and drafting
tools and instruments. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.07.14.50 |
Y |
Y |
29-Sep-2010 |
|
PROF DEV-EE SUPPORT |
PROF DEV-EE
SUPPORT |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
03-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.01 |
Y |
N |
29-Sep-2011 |
|
SPS/SPARE PARTS W/O |
SPS/SPARE PARTS
W/O |
Includes M&S
costs associated with the write-off of Special-Process-Spares and spare parts
inventories. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
B16 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.02 |
Y |
Y |
29-Sep-2011 |
|
FLEET ACQUISITIONS |
FLEET
ACQUISITIONS |
Includes M&S
costs associated with the purchase or leases of vehicles and forklifts,
including after-market vehicle outfitting. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Transportation,
Distribution, Fleet |
B16 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.03.02 |
Y |
Y |
29-Sep-2011 |
|
GEN ALIGN EQ |
GEN ALIGN EQ |
Includes M&S
costs associated with the acquisition of general alignment equipment,
including related software and annual software maintenance agreements. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.03.03 |
Y |
Y |
29-Sep-2011 |
|
GEN ALIGN EQ MAINT |
GEN ALIGN EQ
MAINT |
Includes M&S
costs associated with general alignment equipment hardware maintenance and
repairs. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
B13 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.05.01 |
Y |
Y |
29-Sep-2011 |
|
BO LAPTOP/DSKTP |
BO LAPTOP/DSKTP |
Includes M&S
costs associated with the acquisition of bulk order desktops and laptops for
the division. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.05.02 |
Y |
Y |
29-Sep-2011 |
|
BO LAPTOP/DSKTP TSF |
BO LAPTOP/DSKTP
TSF |
Includes credits
associated with the distribution of bulk order desktops and laptops to other
D/S/C's, projects and cost objectives. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.06 |
Y |
Y |
29-Sep-2011 |
|
EMPL RECRUITING |
EMPL RECRUITING |
Includes M&S
and travel costs associated with Accelerator Division workforce recruiting |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
A2 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.07 |
Y |
Y |
29-Sep-2011 |
|
EMPL RELOCATION |
EMPL RELOCATION |
Includes M&S
and travel costs associated with Accelerator Division workforce relocation. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
A2 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.08 |
Y |
Y |
29-Sep-2011 |
|
VISITOR SUPPORT |
VISITOR SUPPORT |
Includes M&S
and travel costs associated with visitor support agreements, i.e. H-1B
extension/petition fees, housing, transportation, etc. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
A2 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.10 |
Y |
Y |
29-Sep-2011 |
|
PHYSICS SEMINARS |
PHYSICS SEMINARS |
Includes
M&S, travel and other incidental costs associated with bringing physics
seminars speakers to the laboratory. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Executive
Management/COO |
Communication /
Education / Public Outreach |
A8 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.11 |
Y |
Y |
29-Sep-2011 |
|
SHLD ASS & MODS M&S |
SHLD ASS &
MODS M&S |
Includes M&S
associated with shielding assessments and modifications. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
12-Sep-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.12 |
Y |
Y |
26-Sep-2014 |
|
ICFA GEN'L OPERATING |
ICFA GEN'L
OPERATING |
Includes M&S
and travel costs associated with ICFA related activities including ICFA
meetings, workshops, newsletters (printing and mailing) and contract editing
services. |
AD - HEADQUARTERS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
Conference
Organization |
A1 |
19-Nov-2014 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.13 |
Y |
N |
26-Sep-2014 |
|
NIU CRE ACC PHY G&A |
NIU CRE ACC PHY
G&A |
Used exclusively
for joint appointment M&S costs associated with CRADA FRA-2014-0020 NIU
CRE for Accelerator Physics: G&A overhead pool activities. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Executive
Management/COO |
D/S/C
Administration |
A1 |
22-Dec-2014 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.14 |
Y |
Y |
26-Sep-2014 |
|
SPP BUSINESS DEV |
SPP BUSINESS DEV |
Includes costs
associated with Strategic Partnership Project (Work-for-Others, CRADA's,
Technology Transfers) business development. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Business
Operations |
Business
Development |
BD |
16-Apr-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.17 |
Y |
Y |
28-Sep-2016 |
|
TUITION BENEFIT |
TUITION BENEFIT |
Includes M&S
division-wide costs associated with the laboratory's tuition benefit program
including tuition, books, fees and other allowable expenses. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
A2 |
29-Nov-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.18 |
Y |
N |
26-Sep-2019 |
|
NIU CRE ACC PHY KA22 |
NIU CRE ACC PHY
KA22 |
Used exclusively
for joint appointment M&S costs associated with CRADA FRA-2014-0020 NIU
CRE for Accelerator Physics: accelerator operations activities. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
30-Mar-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.19 |
Y |
N |
26-Sep-2020 |
|
LEGAL DEPOSITIONS |
LEGAL DEPOSITIONS |
Includes witness
effort associated with preparation for legal depositions and legal deposition
proceedings. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Business
Operations |
Legal Services |
A5 |
09-Dec-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.20 |
Y |
N |
26-Sep-2020 |
|
EDI Programs |
EDI Programs |
Includes EFFORT
in support of established EDI programs, including Lab Resource Groups, lab at
hiring conferences in connection with the EDI office, and other workforce
development activities addressing equity and impacting lab culture and
climate. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Overhead - Other |
EDI - Equity,
Diversity and Inclusion |
A2 |
23-Jun-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.01.21 |
Y |
N |
26-Sep-2020 |
|
EPE Office Programs |
EPE Office
Programs |
Includes EFFORT
in support of education or engagement of the public or students in support of
Fermilab mission/Fermilab science, and aligning with EPE Office programs. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Overhead - Other |
EPE - Education
and Public Engagement |
A8 |
23-Jun-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.02.01.01 |
Y |
Y |
29-Sep-2011 |
|
DSKT HW/SW-HQ |
DSKT HW/SW-HQ |
Includes desktop
hardware (computers, printers, keyboards, etc.), desktop software licenses
and annual software maintenance. Does not include engineering and design
software licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d,
etc. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.02.01.02 |
Y |
Y |
29-Sep-2011 |
|
DSKT HW MAINT-HQ |
DSKT HW MAINT-HQ |
Includes M&S
costs associated with desktop hardware maintenance and repairs. Maintenance
and repair costs associated with systems which are deployed primarily as
engineering tools, such as CAD systems, should not be charged to this task. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.02.03 |
Y |
Y |
29-Sep-2011 |
|
GP SUPP & EQ-HDQTRS |
GP SUPP &
EQ-HDQTRS |
Includes M&S
associated with general support of a department such as mobile phones,
pagers, water, paper goods, office supplies, office furnishings, etc. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.02.05 |
Y |
Y |
29-Sep-2011 |
|
PROF DEV-HQ |
PROF DEV-HQ |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.03.03 |
Y |
Y |
29-Sep-2011 |
|
REIMBURSABLE TRAVEL |
REIMBURSABLE
TRAVEL |
Includes travel
and associated M&S for which reimbursement is expected. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
D/S/C
Administration |
C20 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.03.04 |
Y |
Y |
29-Sep-2011 |
|
TRN SUSP ACCT |
TRN SUSP ACCT |
TRANSACTION
SUSPENSE ACCOUNT |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
D/S/C
Administration |
C20 |
18-Jul-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.03.09 |
Y |
N |
26-Sep-2020 |
|
UC SN / STUD RES LAB |
UC SN / STUD RES
LAB |
Used exclusively
to accumulate Sergei Nagaitsev's effort for purposes of invoicing University
of Chicago: Set Up Student Research Laboratory |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
12-Oct-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.03.10 |
Y |
N |
26-Sep-2020 |
|
UC SN NOI INT EL BUN |
UC SN NOI INT EL
BUN |
Used exclusively
to accumulate Sergei Nagaitsev's grant-related effort for purposes of
invoicing University of Chicago: Noise in Intense Electron Bunches |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
12-Oct-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.03.11 |
Y |
N |
26-Sep-2020 |
|
UC SN LEV AI-ML TECH |
UC SN LEV AI-ML
TECH |
Used exclusively
to accumulate Sergei Nagaitsev's grant-related effort for purposes of
invoicing University of Chicago: Leveraging AI-ML Techniques |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
12-Oct-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.07.01 |
Y |
Y |
27-Sep-2017 |
|
USPAS STUDENT TRV |
USPAS STUDENT TRV |
Includes TRAVEL and EFFORT associated with U S Particle Accelerator School (USPAS) attendance and participation by Fermilab employees in a student capacity. Use 20.39.03.01 for Accelerator PhD student participation. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Human Resources |
C20 |
04-Oct-2017 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.07.02 |
Y |
Y |
27-Sep-2017 |
|
USPAS INSTRUCTOR TRV |
USPAS INSTRUCTOR
TRV |
Includes TRAVEL
and EFFORT associated with U S Particle Accelerator School (USPAS) attendance
and participation by Fermilab employees in a teaching capacity. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Executive
Management/COO |
Communication /
Education / Public Outreach |
A8 |
04-Oct-2017 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.16.24 |
Y |
Y |
26-Sep-2019 |
|
TSIB CONCEPT DESIGN |
TSIB CONCEPT
DESIGN |
Includes costs
associated with Target Systems Integration Building (TSIB) conceptual design
development. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Facilities
Management |
Site Improvements |
B12 |
21-Apr-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.16.25 |
Y |
Y |
26-Sep-2019 |
|
CAST CONCEPT DESIGN |
CAST CONCEPT
DESIGN |
Includes costs
associated with Center for Accelerator Science and Technology (CAST)
conceptual design development. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Facilities
Management |
Site Improvements |
B12 |
21-Apr-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.20.01 |
Y |
N |
28-Sep-2022 |
|
PROGRAM POWER-BEAMS |
PROGRAM
POWER-BEAMS |
Includes power
costs associated with accelerator and beamline operations. Replaces
Directorate task 15.03. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accel Power |
Power |
B14 |
28-Oct-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.99.02 |
Y |
Y |
26-Sep-2015 |
|
PC SUSP-I CAMPOS |
PC SUSP-I CAMPOS |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
03-Dec-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.99.03 |
Y |
Y |
26-Sep-2015 |
|
PC SUSP-M FRANCK |
PC SUSP-M FRANCK |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - HEADQUARTERS OFFICE |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
08-Mar-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.99.04 |
Y |
Y |
26-Sep-2015 |
|
PC SUSP-K SZAL |
PC SUSP-K SZAL |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
16-May-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.99.08 |
Y |
Y |
30-Dec-1999 |
|
PC SUSP-L ANDERSON |
PC SUSP-L
ANDERSON |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
03-Dec-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.12.99.09 |
Y |
Y |
28-Sep-2022 |
|
PC SUSP-D WILSON |
PC SUSP-D WILSON |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
11-Jan-2023 |
1/11/23 |
20 |
ACCELERATOR DIVISION |
20.12.99.10 |
Y |
Y |
28-Sep-2022 |
|
PC SUSP-S WHITTINGTO |
PC SUSP-S
WHITTINGTO |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
11-Jan-2023 |
1/11/23 |
20 |
ACCELERATOR DIVISION |
20.12.99.11 |
Y |
Y |
28-Sep-2022 |
|
PC SUSP-K RUSHING-HE |
PC SUSP-K
RUSHING-HE |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - HEADQUARTERS OFFICE |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
11-Jan-2023 |
1/11/23 |
20 |
ACCELERATOR DIVISION |
20.13.1.2.10 |
Y |
Y |
29-Sep-2010 |
|
INSTR, GEN'L OPER |
INSTR, GEN'L OPER |
Includes M&S
associated with general purpose instrumentation and beam diagnostics in
support of accelerator operations. Replaces 20.13.1.2.1. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
02-Jun-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.1.2.11 |
Y |
Y |
29-Sep-2011 |
|
FLEET & LOGISTICS |
FLEET &
LOGISTICS |
Includes M&S
associated with materials handling, and fleet and forklift operations. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Transportation,
Distribution, Fleet |
B16 |
15-Dec-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.1.2.12 |
Y |
Y |
26-Sep-2013 |
|
INSTRUMENTATION R&D |
INSTRUMENTATION
R&D |
Includes M&S
costs associated with instrumentation and beam diagnostic R&D initiatives
which are not specific to a particular accelerator or beamline, project or
R&D program. Replaces 20.13.1.2.9. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
C20 |
11-Oct-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.1.2.13 |
Y |
Y |
26-Sep-2018 |
|
INSTR-MUON CAMPUS |
INSTR-MUON CAMPUS |
Includes M&S
associated with Muon Campus instrumentation operation and maintenance:
profile and intensity monitors, BPM's, VME crates, NIM crates, etc. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
28-Aug-2019 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.1.2.4 |
Y |
Y |
24-Nov-2003 |
|
INSTR-EXTERNAL BEAMS |
INSTR-EXTERNAL
BEAMS |
INSTRUMENTATION-EXTERNAL
BEAMS |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.1.2.5 |
Y |
Y |
24-Nov-2003 |
|
INSTR-MAIN INJECTOR |
INSTR-MAIN
INJECTOR |
INSTRUMENTATION-MAIN
INJECTOR |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.1.2.6 |
Y |
Y |
24-Nov-2003 |
|
INSTR-PROTON SOURCE |
INSTR-PROTON
SOURCE |
INSTRUMENTATION-PROTON
SOURCE |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.1.2.7 |
Y |
Y |
24-Nov-2003 |
|
INSTR-RECYCLER RING |
INSTR-RECYCLER
RING |
INSTRUMENTATION-RECYCLER
RING |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.14.3 |
Y |
Y |
29-Dec-2003 |
|
MEASUREMENT EQ |
MEASUREMENT EQ |
Includes M&S
associated with the acquisition of general purpose measurement instruments
such as oscilloscopes, signal analyzers, signal generators, spectrum
analyzers, meters, etc. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Controls & Instrumentation |
B18 |
30-Dec-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.14.40.04 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW MAINT-INST |
DSKT HW
MAINT-INST |
Includes M&S
costs associated with desktop hardware maintenance and repairs. Maintenance
and repair costs associated with systems which are deployed primarily as
engineering tools, such as CAD systems, should not be charged to this task. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.14.40.06 |
Y |
Y |
01-Oct-2006 |
|
GP SUPP & EQ-INSTRUM |
GP SUPP &
EQ-INSTRUM |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.14.41 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW/SW-INST |
DSKT HW/SW-INST |
Includes desktop
hardware (computers, printers, keyboards, etc.), desktop software licenses
and annual software maintenance. Does not include engineering and design
software licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d,
etc. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.14.45 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS-INST |
ENG TLS-INST |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Controls & Instrumentation |
B19 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.14.46 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS HW MT-INST |
ENG TLS HW
MT-INST |
Includes
hardware maintenance costs associated with engineering, design and drafting
tools and instruments. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Controls & Instrumentation |
B13 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.13.14.50 |
Y |
Y |
29-Sep-2010 |
|
PROF DEV-INSTR |
PROF DEV-INSTR |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - INSTRUMENTATION DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
03-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.1.1.5 |
Y |
Y |
13-Jun-1997 |
|
MI OPERATIONS |
MI OPERATIONS |
MI OPERATIONS |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.1.1.7 |
Y |
Y |
13-Jun-1997 |
|
RR OPERATIONS |
RR OPERATIONS |
RR OPERATIONS |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.1.1.8 |
Y |
Y |
22-Jan-1999 |
|
MI DIAG & CONT |
MI DIAG &
CONT |
MI DIAGNOSTICS
& CONTROLS |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.1.1.9 |
Y |
Y |
22-Jan-1999 |
|
MI BEAM LOAD COMP |
MI BEAM LOAD COMP |
MI BEAM LOADING
COMPENSATION |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.14.40.04 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW MAINT-MI |
DSKT HW MAINT-MI |
Includes M&S
costs associated with desktop hardware maintenance and repairs. Maintenance
and repair costs associated with systems which are deployed primarily as
engineering tools, such as CAD systems, should not be charged to this task. |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.14.40.06 |
Y |
Y |
01-Oct-2006 |
|
GP SUPP & EQ-MAIN IN |
GP SUPP &
EQ-MAIN IN |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.14.41 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW/SW-MI |
DSKT HW/SW-MI |
Includes desktop
hardware (computers, printers, keyboards, etc.), desktop software licenses
and annual software maintenance. Does not include engineering and design
software licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d,
etc. |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.14.45 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS-MI |
ENG TLS-MI |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.14.46 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS HW MT-MI |
ENG TLS HW MT-MI |
Includes
hardware maintenance costs associated with engineering, design and drafting
tools and instruments. |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.14.14.50 |
Y |
Y |
29-Sep-2010 |
|
PROF DEV-MAIN INJ |
PROF DEV-MAIN INJ |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
03-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.01.01 |
Y |
Y |
29-Sep-2010 |
|
GEN'L OPS-MECH SYST |
GEN'L OPS-MECH
SYST |
Includes M&S
in support of mechanical systems general operations except that which is
associated with fleet/forklift operations and logistics. Replaces 20.15.1.2.6
(B&R) and 20.15.1.2.39. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.01.04 |
Y |
Y |
29-Sep-2010 |
|
FLEET & LOGISTICS |
FLEET &
LOGISTICS |
Includes M&S
associated with materials handling, and fleet and forklift operations.
Replaces 20.15.1.2.38. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Transportation,
Distribution, Fleet |
B16 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.01.06 |
Y |
Y |
27-Sep-2012 |
|
CLEAN RM GEN SUP |
CLEAN RM GEN SUP |
Includes M&S
and EFFORT for general upkeep/maintenance of cleanroom facilities (NWA, CMTF)
and to facilitate the use of CMTF as a general storage, assembly and testing
facility for large projects. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Business
Operations |
Technical
Facilities Operations / Improvements |
B18 |
01-Jul-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.01.07 |
Y |
Y |
27-Sep-2012 |
|
VAC M&S, GEN ENG SUP |
VAC M&S, GEN
ENG SUP |
Includes M&S
costs associated with the acquisition and maintenance of vacuum system
equipment, tools and supplies, i.e. leak detectors, vacuum/scroll pumps,
turbos, RGA's, etc. Use 20.00.01.77 for related effort including contract
hires. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
01-Jul-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.01.08 |
Y |
Y |
26-Sep-2013 |
|
FLUIDS M&S, GES |
FLUIDS M&S,
GES |
Includes M&S
costs associated with providing general engineering support for accelerator
and beamline fluids systems. Use 20 / 20.00.01.80 for associated effort.
Replaces 20.15.01.03. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
11-Oct-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.01.09 |
Y |
Y |
26-Sep-2014 |
|
CLEANING, GES |
20.15.01.09
CLEANING GES |
Includes M&S
associated with tunnel cleaning typically done at the end of a scheduled
shutdown. Includes Linac, Booster, Main Injector, Muon Campus and beamline
tunnel enclosures. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
02-Sep-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.01.10 |
Y |
Y |
26-Sep-2018 |
|
RF CAV M&S, GES |
RF CAV M&S,
GES |
Includes M&S
costs associated with RF systems operations and maintenance: vacuum system
hardware (flanges, seals, clamps, controllers and gauges, etc.) and related
tools and supplies. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
28-Aug-2019 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.01.11 |
Y |
Y |
28-Sep-2021 |
|
SPOT ROBOTICS INIT |
SPOT ROBOTICS
INIT |
Includes M&S
and EFFORT related to configuring and outfitting SPOT to perform tasks in
support of accelerator operations |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
15-Oct-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.02.01 |
Y |
Y |
29-Sep-2010 |
|
BSTR MECH |
BSTR MECH |
BOOSTER
MECHANICAL. Replaces 20.15.1.2.2. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.02.02 |
Y |
Y |
29-Sep-2010 |
|
BSTR VAC |
BSTR VAC |
BOOSTER VACUUM.
Replaces 20.15.1.2.3. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.02.03 |
Y |
Y |
29-Sep-2010 |
|
BSTR FLUID |
BSTR FLUID |
BOOSTER FLUIDS.
Replaces 20.15.1.2.4. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.03.01 |
Y |
Y |
29-Sep-2010 |
|
BL MECH |
BL MECH |
BEAM LINES
MECHANICAL. Replaces 20.15.1.2.20. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.03.02 |
Y |
Y |
29-Sep-2010 |
|
BL VAC |
BL VAC |
BEAM LINES
VACUUM. Replaces 20.15.1.2.21. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.03.03 |
Y |
Y |
29-Sep-2010 |
|
BL FLUID |
BL FLUID |
BEAM LINES
FLUIDS. Replaces 20.15.1.2.22. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.04.01 |
Y |
Y |
29-Sep-2010 |
|
LINAC MECH |
LINAC MECH |
LINAC
MECHANICAL. Replaces 20.15.1.2.24. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.04.02 |
Y |
Y |
29-Sep-2010 |
|
LINAC VAC |
LINAC VAC |
LINAC VACUUM.
Replace 20.15.1.2.25. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.04.03 |
Y |
Y |
29-Sep-2010 |
|
LINAC FLUID |
LINAC FLUID |
LINAC FLUIDS.
Replaces 20.15.1.2.26. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.05.01 |
Y |
Y |
29-Sep-2010 |
|
MI MECH |
MI MECH |
MI MECHANICAL.
Replaces 20.15.1.2.12. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.05.02 |
Y |
Y |
29-Sep-2010 |
|
MI VAC |
MI VAC |
MI VACUUM.
Replaces 20.15.1.2.19. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.05.03 |
Y |
Y |
29-Sep-2010 |
|
MI FLUID |
MI FLUID |
MI FLUIDS.
Replaces 20.15.1.2.13. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.06.01 |
Y |
Y |
29-Sep-2010 |
|
RR MECH |
RR MECH |
RECYCLER
MECHANICAL. Replaces 20.15.1.2.31. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.06.02 |
Y |
Y |
29-Sep-2010 |
|
RR VAC |
RR VAC |
RECYCLER VACUUM.
Replaces 20.15.1.2.33. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
18-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.07.01 |
Y |
Y |
26-Sep-2013 |
|
MUON SRC MECH |
MUON SRC MECH |
Includes M&S
associated with maintenance and repair of Muon Source (old p-bar complex)
mechanical systems except that related to contract hires (use
20.00.02.34.01.02 instead) or decommissioning. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
B13 |
18-Oct-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.07.02 |
Y |
Y |
26-Sep-2013 |
|
MUON SRC VACUUM |
MUON SRC VACUUM |
Includes M&S
associated with maintenance and repair of Muon Source (old p-bar complex)
vaccum systems except that related to contract hires (use 20.00.02.34.01.02
instead) or decommissioning. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
B13 |
18-Oct-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.07.03 |
Y |
Y |
26-Sep-2013 |
|
MUON SRC FLUIDS |
MUON SRC FLUIDS |
Includes M&S
associated with maintenance and repair of Muon Source (old p-bar complex)
fluids systems except that related to contract hires (use 20.00.02.34.01.02
instead) or decommissioning. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
B13 |
18-Oct-2013 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.13.02 |
Y |
Y |
26-Sep-2013 |
|
CMTF FACILITY OPS |
CMTF FACILITY OPS |
Includes M&S
and EFFORT associated with CMTF facility operations: cryogenics, vacuum,
water and air systems, janitorial services, and other activities associated
with general operation and maintenance of the facility and associated
infrastructure. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
FUTURE R&D |
KA250201 |
KA 25 02 01 TEST
FACILITIES - ACCELERATOR |
OP-FUTURE
R&D-TEST FACILITIES |
AccelTestFacilities |
SRF Operations |
Technical
Facilities Operations / Improvements |
C20 |
30-Jun-2014 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.13.11 |
Y |
Y |
28-Sep-2021 |
|
MDB FACILITY OPS |
MDB FACILITY OPS |
Includes M&S
and EFFORT associated with MDB Test Facility operations support: water, air,
controls, RF and safety systems, and general operations of the building.
Replaces 20.43.04.01.01 and 20.43.04.02.01. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
FUTURE R&D |
KA250201 |
KA 25 02 01 TEST
FACILITIES - ACCELERATOR |
OP-FUTURE
R&D-TEST FACILITIES |
AccelTestFacilities |
SRF Operations |
Technical
Facilities Operations / Improvements |
C20 |
29-Aug-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.14.40.04 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW MAINT-MSD |
DSKT HW MAINT-MSD |
Includes M&S
costs associated with desktop hardware maintenance and repairs. Maintenance
and repair costs associated with systems which are deployed primarily as
engineering tools, such as CAD systems, should not be charged to this task. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.14.40.06 |
Y |
Y |
01-Oct-2006 |
|
GP SUPP & EQ-MSD |
GP SUPP &
EQ-MSD |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.14.41 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW/SW-MSD |
DSKT HW/SW-MSD |
Includes desktop
hardware (computers, printers, keyboards, etc.), desktop software licenses
and annual software maintenance. Does not include engineering and design
software licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d,
etc. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.14.45 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS-MSD |
ENG TLS-MSD |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.14.46 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS HW MT-MSD |
ENG TLS HW MT-MSD |
Includes
hardware maintenance costs associated with engineering, design and drafting
tools and instruments. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.15.14.50 |
Y |
Y |
29-Sep-2010 |
|
PROF DEV-MECH SUPP |
PROF DEV-MECH
SUPP |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - MECHANICAL SUPPORT DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
03-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.18 |
Y |
Y |
24-Nov-2003 |
|
LL RF RECYCLER |
LL RF RECYCLER |
LL RF RECYCLER |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.19 |
Y |
Y |
24-Nov-2003 |
|
HL RF MAIN INJECTOR |
HL RF MAIN
INJECTOR |
HL RF MAIN
INJECTOR |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.21 |
Y |
Y |
24-Nov-2003 |
|
HL RF PROTON SRC |
HL RF PROTON SRC |
HL RF PROTON
SOURCE |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.22 |
Y |
Y |
24-Nov-2003 |
|
HL RF RECYCLER |
HL RF RECYCLER |
HL RF RECYCLER |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
24-Nov-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.23 |
Y |
Y |
12-Jan-2004 |
|
LL RF PROTON SRCE |
LL RF PROTON SRCE |
LL RF PROTON
SOURCE |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
13-Jan-2004 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.29 |
Y |
Y |
29-Sep-2010 |
|
HLRF GEN'L OPS |
HLRF GEN'L OPS |
Includes M&S
in support of HLRF operations which cannot be associated with any one
particular machine. |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
23-May-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.30 |
Y |
Y |
29-Sep-2010 |
|
LLRF GEN'L OPS |
LLRF GEN'L OPS |
Includes M&S
in support of LLRF operations which cannot be associated with any one
particular machine. |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
23-May-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.32 |
Y |
Y |
29-Sep-2011 |
|
FLEET & LOGISTICS |
FLEET &
LOGISTICS |
Includes M&S
associated with materials handling, and fleet and forklift operations. |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Transportation,
Distribution, Fleet |
B16 |
15-Dec-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.33 |
Y |
Y |
29-Sep-2011 |
|
LLRF TECH UG DES |
LLRF TECH UG DES |
Includes M&S
associated with LLRF System next generation design development. |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
30-Aug-2012 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.34 |
Y |
Y |
26-Sep-2015 |
|
LL RF MUON SOURCE |
LL RF MUON SOURCE |
Includes M&S
costs associated with Muon Source low level RF commissioning and operations
activities. |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
20-Jun-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.35 |
Y |
Y |
26-Sep-2015 |
|
HL RF MUON SOURCE |
HL RF MUON SOURCE |
Includes M&S
costs associated with Muon Source high level RF commissioning and operations
activities. |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
20-Jun-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.36 |
Y |
Y |
26-Sep-2015 |
|
RR ANODE PS REPAIRS |
RR ANODE PS
REPAIRS |
Includes M&S
and effort associated with repairing and/or rebuilding the Recycler Ring
Anode Power Supply following it's failure and subsequent damage by fire on
4/23/16. |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
02-Sep-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.4 |
Y |
Y |
31-Oct-1996 |
|
RFI BOOSTER TUBES |
RFI BOOSTER TUBES |
RFI BOOSTER
TUBES |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.6 |
Y |
Y |
31-Oct-1996 |
|
RFI MAIN INJ TUBES |
RFI MAIN INJ
TUBES |
RFI MAIN
INJECTOR TUBES |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.1.2.9 |
Y |
Y |
02-Jul-1974 |
|
HIGH LEVEL RF |
HIGH LEVEL RF |
HIGH LEVEL RF |
AD - RF DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C20 |
13-Mar-2003 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.14.40.04 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW MAINT-RF |
DSKT HW MAINT-RF |
Includes M&S
costs associated with desktop hardware maintenance and repairs. Maintenance
and repair costs associated with systems which are deployed primarily as
engineering tools, such as CAD systems, should not be charged to this task. |
AD - RF DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.14.40.06 |
Y |
Y |
01-Oct-2006 |
|
GP SUPP & EQ-RF |
GP SUPP &
EQ-RF |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. |
AD - RF DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.14.41 |
Y |
Y |
01-Oct-2006 |
|
DSKT HW/SW-RF |
DSKT HW/SW-RF |
Includes desktop
hardware (computers, printers, keyboards, etc.), desktop software licenses
and annual software maintenance. Does not include engineering and design
software licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d,
etc. |
AD - RF DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
27-Sep-2006 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.14.45 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS-RF |
ENG TLS-RF |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. |
AD - RF DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.14.46 |
Y |
Y |
29-Sep-2011 |
|
ENG TLS HW MT-RF |
ENG TLS HW MT-RF |
Includes
hardware maintenance costs associated with engineering, design and drafting
tools and instruments. |
AD - RF DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
05-Oct-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.18.14.50 |
Y |
Y |
29-Sep-2010 |
|
PROF DEV-RF |
PROF DEV-RF |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - RF DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
03-Aug-2011 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.19.1.1.3 |
Y |
N |
28-Sep-2021 |
|
WIP SHIELD BLOCK |
WIP SHIELD BLOCK |
Includes costs
associated with accuring S2 Steel Shield Block |
AD - SPS / SPARE PARTS |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
11-Mar-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.19.1.1.4 |
Y |
N |
28-Sep-2021 |
27-Sep-2023 |
SPS SHIELD BLOCK |
SPS SHIELD BLOCK |
SPS SHIELD BLOCK |
AD - SPS / SPARE PARTS |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
11-Mar-2022 |
6/29/23 |
20 |
ACCELERATOR DIVISION |
20.37.01.01 |
Y |
Y |
26-Sep-2014 |
|
TARG SYST BENCH STK |
TARG SYST BENCH
STK |
Includes M&S
costs associated with bench stock purchases for which the final WIP cost
objective is not immediately known. Replaces 20.11.5.9.0. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
External Beamlines |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.01.06.02 |
Y |
Y |
26-Sep-2014 |
|
WIP HORN 1 PH1-06 |
WIP HORN 1 PH1-06 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI Horn
1 PH1-06. Replaces 20.11.5.9.19. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.01.06.05 |
Y |
Y |
26-Sep-2014 |
|
WIP HORN 1 PH1-07 |
WIP HORN 1 PH1-07 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI Horn
1 PH1-07. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
19-Jun-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.01.06.06 |
Y |
Y |
26-Sep-2018 |
|
WIP HORN 1 / PH1-08 |
WIP HORN 1 /
PH1-08 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI Horn
1 PH1-08. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
11-Sep-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.01.07.04 |
Y |
N |
26-Sep-2014 |
|
WIP TARGET TA-07 |
WIP TARGET TA-07 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Target TA-07. Replaces 20.11.5.9.28. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
12-Feb-2015 |
6/28/23 |
20 |
ACCELERATOR DIVISION |
20.37.01.07.05 |
Y |
N |
26-Sep-2014 |
|
WIP TARGET TA-08 |
WIP TARGET TA-08 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Target TA-08. Replaces 20.11.5.9.30. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
12-Feb-2015 |
6/28/23 |
20 |
ACCELERATOR DIVISION |
20.37.01.07.06 |
Y |
N |
26-Sep-2014 |
|
WIP TARGET TA-09 |
WIP TARGET TA-09 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Target TA-09. Replaces 20.11.5.9.31. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
12-Feb-2015 |
6/28/23 |
20 |
ACCELERATOR DIVISION |
20.37.01.08.01 |
Y |
Y |
26-Sep-2014 |
|
WIP MBT-04 HORN |
WIP MBT-04 HORN |
Includes M&S
and EFFORT associated with the fabrication and construction of Booster
Neutrino Beam Horn MBT-04. Replaces 20.11.11.9.2. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
MINIBooNE |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.01.08.02 |
Y |
Y |
26-Sep-2014 |
|
WIP MBT-04 TARGET |
WIP MBT-04 TARGET |
Includes M&S
and EFFORT associated with the fabrication and construction of Booster
Neutrino Beam Target MBT-04. Replaces 20.11.11.9.3. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
MINIBooNE |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.01.08.03 |
Y |
N |
28-Sep-2016 |
|
WIP MBT-05 HORN&TARG |
WIP MBT-05
HORN&TARG |
Includes M&S
and EFFORT associated with the fabrication and construction of Booster
Neutrino Beam MBT-05 Horn and Target. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
MINIBooNE |
C20 |
27-Jun-2017 |
6/28/23 |
20 |
ACCELERATOR DIVISION |
20.37.02.01.01 |
Y |
Y |
26-Sep-2014 |
|
GEN ENGR OPS-TSD |
GEN ENGR OPS-TSD |
Includes M&S
and EFFORT associated with target systems engineering operations not specific
to a particular target facility. Replaced by 20.37.02.01.05 in FY20. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
External Beamlines |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.01.04 |
Y |
Y |
26-Sep-2018 |
|
MARS DEVEL / EXEC |
MARS DEVEL / EXEC |
Includes costs
related to supporting the cartoon and Heimdall clusters and thudpucker, as
well as effort related to studies aimed at evaluating various accelerator and
beamline (beam loss, collimators, targets, beam dumps), and ES&H
activities. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
ESH&Q |
Safety Services |
B11 |
18-Sep-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.01.05 |
Y |
Y |
28-Sep-2018 |
|
GENERAL TS OPS-TSD |
GENERAL TS
OPS-TSD |
Includes M&S
and EFFORT associated with target systems operations not specific to a
particular target facility (e.g. MI-8 workshop operations). Replaces
20.37.02.01.01 and 20.37.02.01.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
External Beamlines |
C20 |
29-May-2019 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.02.01 |
Y |
Y |
26-Sep-2014 |
|
RH&SF OPERATIONS |
RH&SF
OPERATIONS |
Includes M&S
and EFFORT associated with the ongoing operation of the remote handling and
storage facilities at C-0 and TSB. Replaces 20.11.5.11.03 and
20.00.02.11.05.05. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
Technical
Facilities Operations / Improvements |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.02.02 |
Y |
Y |
26-Sep-2014 |
|
RH&SF MAINTENANCE |
RH&SF
MAINTENANCE |
Includes M&S
and EFFORT associated with the ongoing maintenance of the remote handling and
storage facilities at C-0 and TSB. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
Technical
Facilities Operations / Improvements |
B13 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.02.04 |
Y |
Y |
26-Sep-2014 |
|
RADA COMP DISP CONT |
RADA COMP DISP
CONT |
Includes M&S
costs associated with off-site disposal containers and packaging for
radioactive target system components. Does not include transportation
off-site or disposal site costs. Use 20.37.02.02.01 for related effort.
Replaces 20.15.12.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
Technical
Facilities Operations / Improvements |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.03.01 |
Y |
Y |
26-Sep-2014 |
|
N/N TS OPERATIONS |
N/N TS OPERATIONS |
Includes M&S
and EFFORT associated with NOvA-NuMI target systems operations: US primary
beam window (pre-target) to the DS Hadron absorber. Replaces 20.11.5.2 and
20.00.02.11.05.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.03.02 |
Y |
Y |
26-Sep-2014 |
|
N/N TS MAINTENANCE |
N/N TS
MAINTENANCE |
Includes M&S
and EFFORT associated with NOvA-NuMI target systems maintenance: US primary
beam window (pre-target) to the DS Hadron absorber. Replaces 20.11.5.3. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
B13 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.03.03 |
Y |
Y |
26-Sep-2014 |
|
N/N TRIT MITIGATION |
N/N TRIT
MITIGATION |
Includes M&S
costs associated with tritium mitigation resulting from NOvA-NuMI target
systems operations. Use 20.37.02.03.01 for related effort. Replaces
20.11.5.4. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.04.01 |
Y |
Y |
26-Sep-2014 |
|
BNB TS OPERATIONS |
BNB TS OPERATIONS |
Includes M&S
and EFFORT associated with Booster Neutrino Beam target systems operations:
US primary beam window (pre-target) to the DS Hadron absorber. Replaces
20.11.11.10 and 20.00.02.11.11.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
MINIBooNE |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.04.02 |
Y |
Y |
26-Sep-2014 |
|
BNB TS MAINTENANCE |
BNB TS
MAINTENANCE |
Includes M&S
and EFFORT associated with Booster Neutrino Beam target systems maintenance:
US primary beam window (pre-target) to the DS Hadron absorber. Replaces
20.11.11.2. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
MINIBooNE |
B13 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.05.01 |
Y |
Y |
26-Sep-2015 |
|
g-2 TS OPERATIONS |
g-2 TS OPERATIONS |
Includes M&S
and EFFORT associated with g-2 target systems operations: US primary beam
window (pre-target) to the DS Hadron absorber. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
g-2 |
C20 |
24-May-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.05.02 |
Y |
Y |
26-Sep-2015 |
|
g-2 TS MAINTENANCE |
g-2 TS
MAINTENANCE |
Includes M&S
and EFFORT associated with g-2 target systems maintenance: US primary beam
window (pre-target) to the DS Hadron absorber. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
g-2 |
C20 |
24-May-2016 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.06.01 |
Y |
Y |
28-Sep-2018 |
|
Mu2e TS OPERATIONS |
Mu2e TS
OPERATIONS |
Includes M&S
and EFFORT associated with Mu2e target systems operations: US entrance to HRS
to proton absorber, including remote handling. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
Mu2e - Muon to
Electron Conversion Experiment |
C20 |
02-Apr-2019 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.06.02 |
Y |
Y |
28-Sep-2018 |
|
Mu2e TS MAINTENANCE |
Mu2e TS
MAINTENANCE |
Includes M&S
and EFFORT associated with Mu2e target systems maintenance: US entrance to
HRS to proton absorber, including remote handling. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
Mu2e - Muon to
Electron Conversion Experiment |
C20 |
02-Apr-2019 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.02.07.01 |
Y |
Y |
28-Sep-2021 |
|
LBNF TS OPERATIONS |
LBNF TS
OPERATIONS |
Includes M&S
and EFFORT associated with LBNF target systems operations: US primary beam
window (pre-target) to the DS Hadron absorber. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
LBNE - Long
Baseline Neutrino Experiment |
C20 |
30-Jun-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.03.01 |
Y |
Y |
26-Sep-2014 |
|
HPT R&D RAD DAM STUD |
HPT R&D RAD
DAM STUD |
Includes M&S
and EFFORT associated with radiation damage studies and experiments in
support of the general High Power Targetry R&D program. Replaces
20.15.10.01. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Particle Sources
& Targets |
High Power Target
R&D |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.03.02 |
Y |
Y |
26-Sep-2014 |
|
HPT R&D TGT ENG STUD |
HPT R&D TGT
ENG STUD |
Includes M&S
and EFFORT associated with target related engineering studies and experiments
(thermo-mechanical/electro-magnetic) in support of the general High Power
Targetry R&D program. Replaces 20.15.10.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Particle Sources
& Targets |
High Power Target
R&D |
C20 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.03.13 |
Y |
Y |
28-Sep-2018 |
|
HPT NT R&D AND PLAN |
HPT NT R&D
AND PLAN |
Includes M&S
and EFFORT associated with High Power Targetry R&D and planning in
support of current and near-future target components and target facility
operations. Replaces 20.37.03.10, 20.37.03.11 and 20.37.03.12. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
High Power Target
R&D |
C20 |
29-May-2019 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.14.40.04 |
Y |
Y |
26-Sep-2014 |
|
DSKT HW MAINT-TSD |
DSKT HW MAINT-TSD |
Includes M&S
costs associated with desktop hardware maintenance and repairs. Maintenance
and repair costs associated with systems deployed primarily as engineering
tools, such as CAD systems, should not be charged to this task. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.14.40.06 |
Y |
Y |
26-Sep-2014 |
|
GP SUPP & EQ-TSD |
GP SUPP &
EQ-TSD |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.14.41 |
Y |
Y |
26-Sep-2014 |
|
DSKT HW/SW-TSD |
DSKT HW/SW-TSD |
Includes desktop
hardware (computers, printers, keyboards, etc.), desktop software licenses
and annual software maintenance. Does not include engineering and design
software licenses or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d,
etc. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.14.45 |
Y |
Y |
26-Sep-2014 |
|
ENG TLS-TSD |
ENG TLS-TSD |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.14.46 |
Y |
Y |
26-Sep-2014 |
|
ENG TLS HW MT-TSD |
ENG TLS HW MT-TSD |
Includes
hardware maintenance costs associated with engineering, design and drafting
tools and instruments. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.14.50 |
Y |
Y |
26-Sep-2014 |
|
PROF DEV-TSD |
PROF DEV-TSD |
Includes travel
costs and fees associated with conference/workshop attendance by
NON-SCIENTIFIC personnel. Effort associated with event attendance should be
reported as Hours Worked. Use of this task for scientist travel requires Sr.
FFM approval. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
12-Feb-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.99.01 |
Y |
Y |
26-Sep-2015 |
|
PC SUSPENSE-SCHRAM |
PC
SUSPENSE-SCHRAM |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
Accelerator
Operations General |
C20 |
19-Oct-2015 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.37.99.02 |
Y |
Y |
28-Sep-2022 |
|
PC SUSPENSE-BOGART |
PC
SUSPENSE-BOGART |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
09-Nov-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.01.01 |
Y |
Y |
26-Sep-2018 |
|
MODEL AND THEORY |
MODEL AND THEORY |
Includes costs
associated with general accelerator theory and modeling activities. Replaces
20.35.02.01. |
AD - ARD - ACCELERATOR PHYSICS SUPPORT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
Accelerator
Science General |
C20 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.01.02 |
Y |
Y |
26-Sep-2018 |
|
AARD INITIATIVES |
AARD INITIATIVES |
Includes costs
associated with advanced accelerator R&D initiatives towards future
energy and intensity frontier machines. Replaces 20.35.02.03. |
AD - ARD - ACCELERATOR PHYSICS SUPPORT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Advanced
Accelerator Concepts |
New Initiatives
Not Otherwise Categorized |
C20 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.02.01 |
Y |
Y |
09-Oct-2018 |
|
IOTA-FAST RESEARCH |
IOTA-FAST
RESEARCH |
Includes costs
associated with conducting accelerator physics research at the IOTA ring, its
e- injector (photoinjector, 50 MeV injector, main SRF CM linac and beamlines)
and proton/H- injector (RFQ and beamlines). Replaces 20.35.01.01.02. |
AD - ARD - ACCELERATOR RESEARCH DEPARTMENT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
FAST - Fermilab
Accelerator Science and Technology |
C20 |
09-Oct-2018 |
1/19/23 |
20 |
ACCELERATOR DIVISION |
20.39.02.02 |
Y |
Y |
26-Sep-2020 |
|
IOTA-FAST RES AI-ML |
IOTA-FAST RES
AI-ML |
Includes costs
related to artificial intelligence and machine learning (AI/ML) research
conducted at the IOTA ring, its e- injector (photoinjector, 50 MeV injector,
main SRF CM linac and beamlines) and proton/H- injector (RFQ and beamlines). |
AD - ARD - ACCELERATOR RESEARCH DEPARTMENT |
OPERATING |
FUTURE R&D |
KA2401046 |
KA 24 01 046 GARD
- AI & ML |
OP-GARD-AI &
ML |
AccelRD |
GARD AI/ML |
Artificial
Intelligence and Machine Learning |
C20 |
04-Jan-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.03.01 |
Y |
N |
26-Sep-2018 |
|
ACCEL PHD PROGRAM |
ACCEL PHD PROGRAM |
Includes costs
associated with Accelerator PhD Program including effort associated with
program administration and oversight. Replaces 20.35.04.01. |
AD - ARD - ACCELERATOR TRAINING PROGRAMS |
OPERATING |
BURDEN |
EC0101060 |
G&A OVERHEAD |
OP-BURDEN-G&A |
Overhead |
Executive
Management/COO |
Communication /
Education / Public Outreach |
A8 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.03.02 |
Y |
Y |
26-Sep-2018 |
|
H EDWARDS INTERNSHIP |
H EDWARDS
INTERNSHIP |
Includes costs
associated Helen Edwards intern support: salaries, housing, transportation,
etc. Effort associated with program administration and oversight should be
reported to 20.00.01.66 EDUCATION & OUTREACH ACTIVITIES. Replaces
20.35.04.06. |
AD - ARD - ACCELERATOR TRAINING PROGRAMS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-NO CSS |
AccelRD |
Accelerator and
Beam Physics |
Communication /
Education / Public Outreach |
C20 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.03.03 |
Y |
Y |
26-Sep-2018 |
|
LEE TENG INTERNSHIP |
LEE TENG
INTERNSHIP |
Includes costs
associated with Lee Teng intern support: salaries, housing, transportation,
etc. Effort associated with program administration and oversight should be
reported to 20.00.01.66 EDUCATION & OUTREACH ACTIVITIES. Replaces
20.35.04.05. |
AD - ARD - ACCELERATOR TRAINING PROGRAMS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-NO CSS |
AccelRD |
Accelerator and
Beam Physics |
Communication /
Education / Public Outreach |
C20 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.03.04 |
Y |
Y |
26-Sep-2018 |
|
PEOPLES FELLOWSHIP |
PEOPLES
FELLOWSHIP |
Includes M&S
costs in support of Peoples Fellow research. Effort associated with Peoples
Fellowship committee service should be reported to 20.00.01.71 REVIEW &
COMMITTEE SERVICE, INTERNAL. Replaces 20.35.04.02. |
AD - ARD - ACCELERATOR TRAINING PROGRAMS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
Communication /
Education / Public Outreach |
C20 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.04.01 |
Y |
Y |
26-Sep-2018 |
|
ARD GENERAL OPS |
ARD GENERAL OPS |
Includes general
Accelerator Research Division workforce support M&S costs such as office
supplies, water, paper goods, phones and accessories, etc. Replaces
20.35.14.06. |
AD - ARD - ADMINISTRATION |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
09-Oct-2018 |
3/28/23 |
20 |
ACCELERATOR DIVISION |
20.39.04.02 |
Y |
Y |
26-Sep-2018 |
|
ARD DSKT HW/SW |
ARD DSKT HW/SW |
Includes M&S
costs related to primary desktop hardware and software. Costs associated with
systems or software integral to research activities should be charged to the
appropriate research activity. Replaces 20.35.14.40.04 and 20.35.14.41. |
AD - ARD - ADMINISTRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
09-Oct-2018 |
3/28/23 |
20 |
ACCELERATOR DIVISION |
20.39.04.03 |
Y |
N |
26-Sep-2018 |
|
UNIV JOINT APPTS-NIU |
UNIV JOINT
APPTS-NIU |
To be used
exclusively for costs associated with MOU's between Northern Illinois
University and Fermilab. Replaces 20.35.05.05. |
AD - ARD - ADMINISTRATION |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
Future Accelerator
R&D General |
C20 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.04.04 |
Y |
Y |
26-Sep-2018 |
|
ARD CONF / WKSHP ATT |
ARD CONF / WKSHP
ATT |
Includes costs
associated with attendance at symposiums, conferences and workshops
predominately related to general and advanced accelerator science topics.
Includes travel, attendance, pre/post effort, etc. Replaces 20.35.05.01. |
AD - ARD - ADMINISTRATION |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
Human Resources |
C20 |
09-Oct-2018 |
3/28/23 |
20 |
ACCELERATOR DIVISION |
20.39.04.05 |
Y |
Y |
26-Sep-2018 |
|
ARD CONF / WKSHP ORG |
ARD CONF / WKSHP
ORG |
GARD FUNDING -
SECURE V. SHILTSEV APPROVAL for M&S, effort and travel costs associated
with organizing conferences, symposiums, seminars or workshops predominately
related to general and advanced accelerator science topics. Replaces
20.35.05.02. |
AD - ARD - ADMINISTRATION |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
Conference
Organization |
C20 |
09-Oct-2018 |
3/28/23 |
20 |
ACCELERATOR DIVISION |
20.39.04.06 |
Y |
Y |
26-Sep-2018 |
|
ARD PROF DEV |
ARD PROF DEV |
Includes M&S
and travel related to attendance at formal structured events for professional
development purposes. Related effort should be reported as hours worked. AD
FFM approval is required if the attendee is a scientist. Replaces
20.35.14.50. |
AD - ARD - ADMINISTRATION |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
09-Oct-2018 |
3/28/23 |
20 |
ACCELERATOR DIVISION |
20.39.05.02 |
Y |
Y |
26-Sep-2018 |
|
IOTA-FAST RES SUPP |
IOTA-FAST RES
SUPP |
Includes costs
associated with activities in support of accelerator physics research at the
IOTA-FAST Facility. Replaces 20.35.01.02.01, 20.35.01.02.02 and
20.35.01.02.03. |
AD - ARD - FAST FACILITY DEPARTMENT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
FAST - Fermilab
Accelerator Science and Technology |
C20 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.05.03 |
Y |
Y |
26-Sep-2018 |
|
PROT INJ INFR |
PROT INJ INFR |
Includes costs
associated with construction and installation of the p+/H- injector
components, subsystems and infrastructure. Replaces 20.35.01.03.03. |
AD - ARD - FAST FACILITY DEPARTMENT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
FAST - Fermilab
Accelerator Science and Technology |
C20 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.05.04 |
Y |
Y |
26-Sep-2018 |
|
PROT INJ INFR EQU |
PROT INJ INFR EQU |
Includes costs
associated with construction and installation of the p+/H- injector
components, subsystems and infrastructure. Replaces 20.35.01.03.05. |
AD - ARD - FAST FACILITY DEPARTMENT |
EQUIPMENT |
FUTURE R&D |
KA2501012 |
KA 25 01 012 EQU
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
EQ-FUTURE
R&D-ACCEL |
AccelRD |
Accelerator and
Beam Physics |
FAST - Fermilab
Accelerator Science and Technology |
C21 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.05.05 |
Y |
Y |
26-Sep-2021 |
|
NML FACIILITY OPS |
NML FACIILITY OPS |
Includes costs
related to NML facility operations: cryogenics, vacuum, water and air
systems, janitorial services, and other activities related to general
operation and maintenance of the NML facility and related infrastructure.
Replaces 20.15.13.01. |
AD - ARD - FAST FACILITY DEPARTMENT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
IOTA-FAST
Operations |
FAST - Fermilab
Accelerator Science and Technology |
C20 |
31-Aug-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.05.06 |
Y |
Y |
26-Sep-2021 |
|
FAST ACCEL OPS |
FAST ACCEL OPS |
Includes costs
related to operation and maintenance of the FAST accelerator: gun, laser lab,
injector, cryomodule and beamlines. Replaces 20.39.05.01. |
AD - ARD - FAST FACILITY DEPARTMENT |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL |
AccelRD |
IOTA-FAST
Operations |
FAST - Fermilab
Accelerator Science and Technology |
C20 |
31-Aug-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.39.99.01 |
Y |
Y |
26-Sep-2018 |
|
PC SUSP-L LOPEZ |
PC SUSP-L LOPEZ |
For use
exclusively as a suspense account for ProCard charges awaiting reconciliation
and transfer to the appropriate final cost objective. It should not be used
for any other purpose. Replaces 20.35.99.03. |
AD - ARD - ADMINISTRATION |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
09-Oct-2018 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.02 |
Y |
Y |
26-Sep-2020 |
|
GEN OPS-EBD |
GEN OPS-EBD |
Includes M&S
and EFFORT associated with external beamline operations not specific to a
particular beamline. Replaces 20.38.01.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.03.01 |
Y |
Y |
26-Sep-2020 |
|
N/N BL OPERATIONS |
N/N BL OPERATIONS |
Includes M&S
and EFFORT associated with NOvA-NuMI beamline operations. Replaces
20.38.01.02.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.03.02 |
Y |
Y |
26-Sep-2020 |
|
N/N BL MAINTENANCE |
N/N BL
MAINTENANCE |
Includes M&S
and EFFORT associated with NOvA-NuMI beamline maintenance. Replaces
20.38.01.02.02. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.04.01 |
Y |
Y |
26-Sep-2020 |
|
BNB BL OPERATIONS |
BNB BL OPERATIONS |
Includes M&S
and EFFORT associated with Booster Neutrino Beam beamline operations.
Replaces 20.38.01.03.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.04.02 |
Y |
Y |
26-Sep-2020 |
|
BNB BL MAINTENANCE |
BNB BL
MAINTENANCE |
Includes M&S
and EFFORT associated with Booster Neutrino Beam beamline maintenance.
Replaces 20.38.01.03.02. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.05.01 |
Y |
Y |
26-Sep-2020 |
|
MTA BL OPERATIONS |
MTA BL OPERATIONS |
Includes M&S
and EFFORT associated with MeV Test Area (MTA) operations including beamlline
commissioning activities. Replaces 20.38.01.04.03. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.05.02 |
Y |
Y |
26-Sep-2020 |
|
MTA BL MAINTENANCE |
MTA BL
MAINTENANCE |
Includes M&S
and EFFORT associated with MeV Test Area (MTA) maintenance. Replaces
20.38.01.04.04. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.06.01.01 |
Y |
Y |
26-Sep-2020 |
|
120 GeV SY OPS |
120 GeV SY OPS |
Includes M&S
and EFFORT associated with 120 GeV Switchyard operations. Replaces
20.38.01.05.01.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.06.01.02 |
Y |
Y |
26-Sep-2020 |
|
120 GeV SY MAINT |
120 GeV SY MAINT |
Includes M&S
and EFFORT associated with 120 GeV Switchyard maintenance. Replaces
20.38.01.05.01.02. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.06.02.01 |
Y |
Y |
26-Sep-2020 |
|
NeuMu BL OPERATIONS |
NeuMu BL
OPERATIONS |
Includes M&S
and EFFORT associated with Neutrino Muon beamline operations. Replaces
20.38.01.05.02.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.06.02.02 |
Y |
Y |
26-Sep-2020 |
|
NeuMu BL MAINTENANCE |
NeuMu BL
MAINTENANCE |
Includes M&S
and EFFORT associated with Neutrino Muon beamline maintenance. Replaces
20.38.01.05.02.02. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.06.03.01 |
Y |
Y |
26-Sep-2020 |
|
MESON BL OPS |
MESON BL OPS |
Includes M&S
and EFFORT associated with Meson beamline operations. Replaces
20.38.01.05.03.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.01.06.03.02 |
Y |
Y |
26-Sep-2020 |
|
MESON BL MAINTENANCE |
MESON BL
MAINTENANCE |
Includes M&S
and EFFORT associated with Meson beamline maintenance. Replaces
20.38.01.05.03.02. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.02.02 |
Y |
Y |
26-Sep-2020 |
|
MU SYS GEN OPS |
MU SYS GEN OPS |
Includes M&S
and EFFORT associated with Muon Systems general operations. Replaces
20.34.01.01 and 20.00.02.34.01.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.02.03 |
Y |
Y |
26-Sep-2020 |
|
MU SYS MAINT |
MU SYS MAINT |
Includes M&S
and EFFORT associated with Muon Systems maintenance. Replaces 20.34.01.02 and
20.00.02.34.01.02. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.02.04 |
Y |
Y |
28-Sep-2022 |
|
BR CE PS REPLACE |
BR CE PS REPLACE |
Includes M&S
and EFFORT associated with installation of modern BR correction element power
supplies in lieu of the existing obsolete supplies |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
30-Sep-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.02.05 |
Y |
Y |
28-Sep-2022 |
|
MC SHUNT REPLACE |
MC SHUNT REPLACE |
Includes M&S
and EFFORT associated with installation of new tunnel shunts at various Muon
Campus locations |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
30-Sep-2022 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.02.06 |
Y |
Y |
28-Sep-2022 |
|
Mu2e SAFETY SYSTEMS |
Mu2e SAFETY
SYSTEMS |
Includes costs
associated with procurement, assembly and installation of Mu2e Safety Systems
and operational readiness activities |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
13-Jan-2023 |
1/13/23 |
20 |
ACCELERATOR DIVISION |
20.41.14.40.04 |
Y |
Y |
26-Sep-2020 |
|
DSKT HW MAINT-MUON |
DSKT HW
MAINT-MUON |
Includes M&S
costs related to desktop hardware maintenance or repairs to systems other
than those deployed primarily as engineering tools, i.e. CAD systems, etc.
Replaces 20.34.14.40.04 and 20.38.14.40.04. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.14.40.06 |
Y |
Y |
26-Sep-2020 |
|
GP SUPP & EQ-MUON |
GP SUPP &
EQ-MUON |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. Replaces 20.34.14.40.06 and
20.38.14.40.06. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.14.41 |
Y |
Y |
26-Sep-2020 |
|
DSKT HW/SW-MUON |
DSKT HW/SW-MUON |
Includes desktop
computers and peripherals, and desktop software licenses or annual software
maintenance other than for engineering and design software, i.e. Agilent,
OrCAD, AutoCAD, Opera-3d, etc. Replaces 20.34.14.41 and 20.38.14.41. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
13-Oct-2020 |
3/24/23 |
20 |
ACCELERATOR DIVISION |
20.41.14.45 |
Y |
Y |
26-Sep-2020 |
|
ENG TLS-MUON |
ENG TLS-MUON |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. Replaces 20.34.14.45 and 20.38.14.45. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.14.46 |
Y |
Y |
26-Sep-2020 |
|
ENG TLS HW MT-MUON |
ENG TLS HW
MT-MUON |
Includes
hardware maintenance costs associated with engineering, design and drafting
tools and instruments. Replaces 20.34.14.46 and 20.38.14.46. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.41.14.50 |
Y |
Y |
26-Sep-2020 |
|
PROF DEV-MUON |
PROF DEV-MUON |
Includes travel
costs and fees related to conference/workshop attendance. Effort related to
event attendance should be reported as Hours Worked. Use of this task for
scientist travel requires Sr. FFM approval. Replaces 20.34.14.50 and
20.38.14.50. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
13-Oct-2020 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.42.01.01 |
Y |
Y |
26-Sep-2020 |
|
FACIL M&R-AOG-PR |
FACIL
M&R-AOG-PR |
Includes M&S
and EFFORT related to maintenance and repair of programmatic facilities and
infrastructure which are not related to any one particular accelerator
operations thrust. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.01.02 |
Y |
Y |
26-Sep-2020 |
|
FACIL M&R-BDS-PR |
FACIL
M&R-BDS-PR |
Includes M&S
and EFFORT related to maintenance and repair of programmatic facilities and
infrastructure associated with the Beam Delivery Systems thrust. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.01.03 |
Y |
Y |
26-Sep-2020 |
|
FACIL M&R-C&I-PR |
FACIL
M&R-C&I-PR |
Includes M&S
and EFFORT related to maintenance and repair of programmatic facilities and
infrastructure associated with the Controls and Instrumentation thrust. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Controls &
Instrumentation |
Accelerator
Controls & Instrumentation |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.01.04 |
Y |
Y |
26-Sep-2020 |
|
FACIL M&R-MI-PR |
FACIL
M&R-MI-PR |
Includes M&S
and EFFORT related to maintenance and repair of programmatic facilities and
infrastructure associated with the Main Injector thrust. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.01.05 |
Y |
Y |
26-Sep-2020 |
|
FACIL M&R-MC-PR |
FACIL
M&R-MC-PR |
Includes M&S
and EFFORT related to maintenance and repair of programmatic facilities and
infrastructure associated with the Muon Campus thrust. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Muon Campus |
Muon Source |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.01.06 |
Y |
Y |
26-Sep-2020 |
|
FACIL M&R-PS-PR |
FACIL
M&R-PS-PR |
Includes M&S
and EFFORT related to maintenance and repair of programmatic facilities and
infrastructure associated with the Proton Source thrust. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.01.07 |
Y |
Y |
26-Sep-2020 |
|
FACIL M&R-TS-PR |
FACIL
M&R-TS-PR |
Includes M&S
and EFFORT related to maintenance and repair of programmatic facilities and
infrastructure associated with the Target Systems thrust. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Target Systems |
External Beamlines |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.01.11 |
Y |
Y |
26-Sep-2020 |
|
EMERG RIGGING SERV |
EMERG RIGGING
SERV |
Includes M&S
costs associated with emergency rigging services required to facilitate
maintenance and repair of programmatic facilities and infrastructure.
Replaces 20.09.13.10. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.01.12 |
Y |
Y |
26-Sep-2020 |
|
TUNNEL WATERPROOFING |
TUNNEL
WATERPROOFING |
Includes M&S
costs associated with waterproofing of programmatic tunnels. Replaces
20.09.13.13. |
AD - PLANNING AND INTEGRATION |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.02.01 |
Y |
Y |
26-Sep-2020 |
|
FACIL M&R-NP |
FACIL M&R-NP |
Includes M&S
and EFFORT (non-CFM) associated with non-programmatic facility and
infrastructure maintenance and repairs. Replaces 20.09.13.3, 20.09.13.17,
20.09.13.19, 20.00.01.05 and 20.00.01.86. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Facilities
Management |
Building
Maintenance |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.03.01 |
Y |
Y |
26-Sep-2020 |
|
FACIL MGMT |
FACIL MGMT |
Includes M&S
costs (non-CFM) associated with providing facility related services required
to keep facilities usable: custodial services, pest control, custom signage,
EXIT light identification tags for tunnels, and other services. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Facilities
Management |
Building
Management |
B12 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.03.02 |
Y |
Y |
26-Sep-2020 |
|
FACIL MGMT-S&H |
FACIL
MGMT-S&H |
Includes M&S
and EFFORT related to activities performed to ensure employee safety and to
maintain compliance with Federal, State, and local regulations, and
applicable DOE Orders and directives. Replaces 20.09.13.21, 20.09.13.22 and
20.00.01.13. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
ESH&Q |
Safety Services |
B11 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.03.03 |
Y |
Y |
26-Sep-2020 |
|
FACIL MGMT-ENV |
FACIL MGMT-ENV |
Includes M&S
and EFFORT related to activities performed to ensure compliance with Federal,
State, and local regulations, and applicable DOE Orders and directives
concerning environmental compliance and pollution prevention. Replaces
20.00.01.12. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
ESH&Q |
Environmental
Services |
B10 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.03.04 |
Y |
Y |
26-Sep-2020 |
|
FLEET & LOGISTICS |
FLEET &
LOGISTICS |
Includes M&S
costs associated with materials handling, fleet and forklift operations,
assembly and dis-assembly of furniture and workstations, and relocation of
furniture between offices. Replaces 20.09.13.15. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Facilities
Management |
Transportation,
Distribution, Fleet |
B16 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.04.01 |
Y |
Y |
26-Sep-2020 |
|
FACIL INT A&I |
FACIL INT A&I |
Includes costs
M&S (non-CFM) related to interior modifications of real property:
installation or removal of interior walls, doors or passageways, incidental
HVAC or lighting system modificatons, etc. Replaces 20.09.13.1 and
20.09.13.12. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Facilities
Management |
Building
Improvements |
B12 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.04.02 |
Y |
Y |
28-Sep-2021 |
|
FACIL INT FURNISH |
FACIL INT FURNISH |
Includes M&S
costs related to the acquisition of facilities furnishings not integral to
their location, i.e. desks, chairs, file cabinets, etc. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Facilities
Management |
Building
Improvements |
B12 |
29-Aug-2022 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.14.01 |
Y |
Y |
26-Sep-2020 |
|
GP SUPP & EQ-ESD |
GP SUPP &
EQ-ESD |
Includes M&S
costs related to general purpose supplies and equipment - copiers, mobile
phones, pagers, water, paper goods, office supplies, etc. - required in
support of department personnel. Replaces 20.09.14.40.06. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Building
Maintenance |
B19 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.14.02 |
Y |
Y |
26-Sep-2020 |
|
DSKT HW/SW-ESD |
DSKT HW/SW-ESD |
Includes M&S
costs for desktop computers and peripherals, desktop software licenses and
annual software maintenance except engineering and design software licenses
or maintenance, i.e. Agilent, OrCAD, AutoCAD, Opera-3d, etc. Replaces
20.09.14.41. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.14.03 |
Y |
Y |
26-Sep-2020 |
|
DSKT HW MAINT-ESD |
DSKT HW MAINT-ESD |
Includes M&S
costs for desktop hardware maintenance and repairs. Maintenance and repair
costs associated with systems deployed primarily as engineering tools, such
as CAD systems, should not be charged to this task. Replaces 20.09.14.40.04. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.14.04 |
Y |
Y |
26-Sep-2020 |
|
ENG TLS-ESD |
ENG TLS-ESD |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. Replaces 20.09.14.45. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Building
Maintenance |
B19 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.14.05 |
Y |
Y |
26-Sep-2020 |
|
ENG TLS HW MT-ESD |
ENG TLS HW MT-ESD |
IncludesM&S
costs for hardware maintenance associated with engineering, design and
drafting tools and instruments. Replaces 20.09.14.46. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Building
Maintenance |
B13 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.42.14.06 |
Y |
Y |
26-Sep-2020 |
|
PROF DEV-ESD |
PROF DEV-ESD |
Includes travel
costs and fees related to conference/workshop attendance by NON-SCIENTIFIC
personnel. Related event attendance effort should be reported as Hours
Worked. Scientist travel on this task requires Sr. FFM approval. Replaces
20.09.14.50. |
AD - PLANNING AND INTEGRATION |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
05-Nov-2020 |
3/29/23 |
20 |
ACCELERATOR DIVISION |
20.43.01.01.01 |
Y |
Y |
26-Sep-2021 |
|
BOOSTER OPS |
BOOSTER OPS |
Includes M&S
and EFFORT associated with Booster operations. Replaces 20.00.02.17.01.01 and
20.17.1.1.4. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.01.01.02 |
Y |
Y |
28-Sep-2022 |
|
BOOSTER BPM UPG 20Hz |
BOOSTER BPM UPG
20Hz |
Includes M&S
and SWF costs associated with Booster BPM upgrades including the Booster BPM
Timing Board 20Hz Modification (BTIM), BPM Front-End Programming Modification
[BFEP] and BPM Digitizer FPGA Firmware Modification [BDIG]. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
13-Mar-2023 |
3/13/23 |
20 |
ACCELERATOR DIVISION |
20.43.01.02.01 |
Y |
Y |
26-Sep-2021 |
|
BOOSTER MAINT |
BOOSTER MAINT |
Includes M&S
and EFFORT associated with Booster maintenance. Replaces 20.00.02.17.01.02
and 20.17.1.1.4. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.02.01.01 |
Y |
Y |
26-Sep-2021 |
|
LINAC OPS |
LINAC OPS |
Includes M&S
and EFFORT associated with Linac operations. Replaces 20.00.02.17.02.01 and
20.17.1.1.8. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.02.02.01 |
Y |
Y |
26-Sep-2021 |
|
LINAC MAINT |
LINAC MAINT |
Includes M&S
and EFFORT associated with Linac maintenance. Replaces 20.00.02.17.02.02 and
20.17.1.1.8. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.02.02.02 |
Y |
N |
28-Sep-2021 |
|
LINAC TUBE USE 4616 |
LINAC TUBE USE
4616 |
Includes M&S
associated with 4616 tube usage (installations, in service) and tube
maintenance and repairs. Replaces 20.17.1.1.10. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.02.02.03 |
Y |
N |
28-Sep-2021 |
|
LINAC TUBE USE 7835 |
LINAC TUBE USE
7835 |
Includes M&S
associated with 7835 tube usage (installations, in service) and tube
maintenance and repairs. Replaces 20.17.1.1.10. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.02.02.04 |
Y |
N |
28-Sep-2021 |
|
LINAC TUBE USE KLYST |
LINAC TUBE USE
KLYST |
Includes M&S
associated with Klystron tube usage (installations, in service) and tube
maintenance and repairs. Replaces 20.17.1.1.10. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.02.02.05 |
Y |
N |
28-Sep-2021 |
|
LINAC TUBE USE OTHER |
LINAC TUBE USE
OTHER |
Includes M&S
associated with tube usage (installations, in service) and tube maintenance
and repairs for tubes other than 4616, 7835 and Klystron. Replaces
20.17.1.1.10. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.03.01.01 |
Y |
Y |
26-Sep-2021 |
|
PRE-ACC OPS |
PRE-ACC OPS |
Includes M&S
and EFFORT associated with Pre-Accelerator operations. Replaces
20.00.02.17.03.01 and 20.17.1.1.8. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C20 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.03.02.01 |
Y |
Y |
26-Sep-2021 |
|
PRE-ACC MAINT |
PRE-ACC MAINT |
Includes M&S
and EFFORT associated with Pre-Accelerator maintenance. Replaces
20.00.02.17.03.02 and 20.17.1.1.8. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
OPERATING |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR OPERATIONS |
OP-EXST PRGM
OP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.40.04 |
Y |
Y |
28-Sep-2021 |
|
DSKT HW MAINT-LIN |
DSKT HW MAINT-LIN |
Includes M&S
costs related to desktop hardware maintenance and repairs. Maintenance and
repair costs related to systems deployed primarily as engineering tools, such
as CAD systems, should not be charged to this task. Replaces 20.17.14.40.04. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.40.05 |
Y |
Y |
28-Sep-2021 |
|
DSKT HW MAINT-BST |
DSKT HW MAINT-BST |
Includes M&S
costs related to desktop hardware maintenance and repairs. Maintenance and
repair costs related to systems deployed primarily as engineering tools, such
as CAD systems, should not be charged to this task. Replaces 20.17.14.40.05. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.40.06 |
Y |
Y |
28-Sep-2021 |
|
DSKT HW MAINT-SCL |
DSKT HW MAINT-SCL |
Includes M&S
costs related to desktop hardware maintenance and repairs. Maintenance and
repair costs related to systems deployed primarily as engineering tools, such
as CAD systems, should not be charged to this task. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.40.07 |
Y |
Y |
28-Sep-2021 |
|
GP SUPP & EQ-LINAC |
GP SUPP &
EQ-LINAC |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. Replaces 20.17.14.41. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.40.08 |
Y |
Y |
28-Sep-2021 |
|
GP SUPP & EQ-BOOSTER |
GP SUPP &
EQ-BOOSTER |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. Replaces 20.17.14.42. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.40.09 |
Y |
Y |
28-Sep-2021 |
|
GP SUPP & EQ-SCL |
GP SUPP &
EQ-SCL |
Includes all
general purpose supplies and equipment - copiers, mobile phones, pagers,
water, paper goods, office supplies, etc. - that cannot be directly
associated with a single cost objective. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.41 |
Y |
Y |
28-Sep-2021 |
|
DSKT HW/SW-LIN |
DSKT HW/SW-LIN |
Includes desktop
hardware (computers and peripherals) and software licenses and annual
software maintenance. Does not include engineering and design software
licenses (Agilent, OrCAD, AutoCAD, etc.) or related maintenance. Replaces
20.17.14.40.06. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.42 |
Y |
Y |
28-Sep-2021 |
|
DSKT HW/SW-BST |
DSKT HW/SW-BST |
Includes desktop
hardware (computers and peripherals) and software licenses and annual
software maintenance. Does not include engineering and design software
licenses (Agilent, OrCAD, AutoCAD, etc.) or related maintenance. Replaces
20.17.14.40.07. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.43 |
Y |
Y |
28-Sep-2021 |
|
DSKT HW/SW-SCL |
DSKT HW/SW-SCL |
Includes desktop
hardware (computers and peripherals) and software licenses and annual
software maintenance. Does not include engineering and design software
licenses (Agilent, OrCAD, AutoCAD, etc.) or related maintenance. Replaces
20.40.02.02. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101050 |
CSS OVERHEAD |
OP-BURDEN-CSS |
Overhead |
Information
Systems, Technology Core Services & Network |
Desktop Support |
A9 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.45.01 |
Y |
Y |
28-Sep-2021 |
|
ENG TLS-BST |
ENG TLS-BST |
Includes M&S
costs associated with the acquisition of engineering, design and drafting
tools and instruments, including associated software and supplies, licenses
and annual software maintenance. Replaces 20.17.14.45.01. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.45.02 |
Y |
Y |
28-Sep-2021 |
|
ENG TLS-LIN |
ENG TLS-LIN |
Includes M&S
costs associated with the acquisition of engineering. design and drafting
tools and instruments. including associated software and supplies, licenses
and annual software maintenance. Replaces 20.17.14.45.02. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.45.03 |
Y |
Y |
28-Sep-2021 |
|
ENG TLS-SCL |
ENG TLS-SCL |
Includes M&S
costs associated with the acquisition of engineering. design and drafting
tools and instruments. including associated software and supplies, licenses
and annual software maintenance. Replaces 20.40.02.03. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B19 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.46.01 |
Y |
Y |
28-Sep-2021 |
|
ENG TLS HW MT-BST |
ENG TLS HW MT-BST |
Includes
hardware maintenance costs associated with engineering, design and drafting
tools and instruments. Replaces 20.17.14.46.01. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.46.02 |
Y |
Y |
28-Sep-2021 |
|
ENG TLS HW MT-LIN |
ENG TLS HW MT-LIN |
Includes
hardware maintenance costs associated with engineering. design and drafting
tools and instruments. Replaces 20.17.14.46.02. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.46.03 |
Y |
Y |
28-Sep-2021 |
|
ENG TLS HW MT-SCL |
ENG TLS HW MT-SCL |
Includes
hardware maintenance costs associated with engineering. design and drafting
tools and instruments. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Accelerator
Operations General |
B13 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.50.01 |
Y |
Y |
28-Sep-2021 |
|
PROF DEV-BOOSTER |
PROF DEV-BOOSTER |
Includes travel
costs and fees related to conference/workshop attendance by NON-SCIENTIFIC
personnel. Report effort related to event attendance as Hours Worked. Use of
this task for scientist travel requires Sr. FFM approval. Replaces
20.17.14.50.01. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.50.02 |
Y |
Y |
28-Sep-2021 |
|
PROF DEV-LINAC |
PROF DEV-LINAC |
Includes travel
costs and fees related to conference/workshop attendance by NON-SCIENTIFIC
personnel. Report effort related to event attendance as Hours Worked. Use of
this task for scientist travel requires Sr. FFM approval. Replaces
20.17.14.50.02. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
15-Dec-2021 |
12/19/22 |
20 |
ACCELERATOR DIVISION |
20.43.14.50.03 |
Y |
Y |
28-Sep-2021 |
|
PROF DEV-SCL |
PROF DEV-SCL |
Includes travel
costs and fees related to conference/workshop attendance by NON-SCIENTIFIC
personnel. Report effort related to event attendance as Hours Worked. Use of
this task for scientist travel requires Sr. FFM approval. Replaces
20.40.02.04. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
Human Resources |
B19 |
15-Dec-2021 |
12/19/22 |
204FI |
ACORN |
204FI.KA2203011.ACORN |
Y |
Y |
15-Sep-2020 |
|
ACORN PRE-CONCPT DES |
ACORN PRE-CONCPT
DES |
Shift in B&R
from KA2203011 to KA2203030 - STC OP-PROJECT R&D-ACORN-ADJ |
FI - ACCOUNTING |
OPERATING |
PROJECT R&D |
KA2203011 |
KA 22 03 011
INTENSITY PROJECTS - ACORN OPC |
OP-PROJECT
R&D-ACORN - ADJ |
Projects |
Project-ACORN |
ACORN |
C20 |
25-Nov-2020 |
12/19/22 |
204FI |
ACORN |
204FI.KA2203030.ACORN |
Y |
Y |
15-Sep-2020 |
|
ACORN PRE-CONCPT DES |
ACORN PRE-CONCPT
DES |
Shift in B&R
from KA2203011 to KA2203030 - STC OP-PROJECT R&D-ACORN |
FI - ACCOUNTING |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC |
OP-PROJECT
R&D-ACORN |
Projects |
Project-ACORN |
ACORN |
C20 |
25-Nov-2020 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103L1001 |
Y |
N |
28-Sep-2022 |
|
IRA Prototype PM L |
IRA Prototype PM
L |
IRA Prototyping
- PM Labor |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103L1002 |
Y |
N |
28-Sep-2022 |
|
IRA Prototype APS L |
IRA Prototype APS
L |
IRA Prototyping
- APS Labor |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103L1003 |
Y |
N |
28-Sep-2022 |
|
IRA Prototype DAC L |
IRA Prototype DAC
L |
IRA Prototyping
- DAC Labor |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103L1004 |
Y |
N |
28-Sep-2022 |
|
IRA Prototype CSI L |
IRA Prototype CSI
L |
IRA Prototyping
- CSI Labor |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103L1005 |
Y |
N |
28-Sep-2022 |
|
IRA Prototype CSA L |
IRA Prototype CSA
L |
IRA Prototyping
- CSA Labor |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103M1001 |
Y |
Y |
28-Sep-2022 |
|
IRA Prototype P M M |
IRA Prototype P M
M |
IRA Prototyping
- Project Mgmnt Materials and Services |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103M1002 |
Y |
Y |
28-Sep-2022 |
|
IRA Prototype APS M |
IRA Prototype APS
M |
IRA Prototyping
- APS Materials and Services |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103M1003 |
Y |
Y |
28-Sep-2022 |
|
IRA Prototype DAC M |
IRA Prototype DAC
M |
IRA Prototyping
- DAC Materials and Services |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103M1004 |
Y |
Y |
28-Sep-2022 |
|
IRA Prototype CSI M |
IRA Prototype CSI
M |
IRA Prototyping
- CSI Materials and Services |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204IRA |
ACORN IRA |
204IRA.103M1005 |
Y |
Y |
28-Sep-2022 |
|
IRA Prototype CSA M |
IRA Prototype CSA
M |
IRA Prototyping
- CSA Materials and Services |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC - IRA |
OP-PROJECT
R&D-ACORN-IRA |
Projects |
Project-ACORN |
ACORN |
C20 |
28-Oct-2022 |
12/19/22 |
204 |
ACORN PROJECT |
204.1005BOP |
Y |
Y |
28-Aug-2020 |
|
PM PROJ DEF 21-B |
PM PROJ DEF 21-B |
204.01.02.01
PROJECT DEFINITION FY21-BOTH |
AD - ACORN PROJECT |
OPERATING |
PROJECT R&D |
KA2203030 |
KA 22 03 030
INTENSITY PROJECTS - ACORN OPC |
OP-PROJECT
R&D-ACORN |
Projects |
Project-ACORN |
ACORN |
C20 |
09-Dec-2020 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.AD.01.01 |
Y |
N |
28-Sep-2022 |
27-Sep-2023 |
SPS ACCEL DIV |
SPS ACCEL DIV |
Includes M&S
costs related to Special-Process-Spare (SPS) parts and equipment: new
acquisitions (purchase or fabricated in-house) and parts and equipment
acquired by removal from service or by custody transfer. Replaces 20.19.1.1.1
& 20.SPS.AD.01.01 |
AD - SPS / SPARE PARTS |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
01-Nov-2022 |
6/29/23 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.AD.01.02 |
Y |
N |
28-Sep-2021 |
27-Sep-2023 |
SPS ACCEL DIV CONT |
SPS ACCEL DIV
CONT |
Includes reserve
funds associated with KA 22 02 811 INVENTORY - SPECIAL PROCESS SPARES. Not a
chargeable task. Replaces 20.19.1.1.2. |
AD - SPS / SPARE PARTS |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
22-Dec-2021 |
6/29/23 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.EBD.01.01 |
Y |
N |
28-Sep-2021 |
27-Sep-2023 |
SPS EXT BEAM DEL |
SPS EXT BEAM DEL |
Includes M&S
costs related to external beamline Special-Process-Spare (SPS) parts and
equipment: new acquisitions (purchase or fabricated in-house) and parts and
equipment acquired by removal from service or by custody transfer. Replaces
20.41.01.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Beam Delivery
Systems |
External Beamlines |
C20 |
22-Dec-2021 |
6/29/23 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.EBD.01.02 |
Y |
N |
28-Sep-2021 |
27-Sep-2023 |
SPS MUON SYSTEMS |
SPS MUON SYSTEMS |
Includes M&S
costs related to Muon Systems Special-Process-Spare (SPS) parts and
equipment: new acquisitions (purchase or fabricated in-house) and parts and
equipment acquired by removal from service or by custody transfer. Replaces
20.41.02.01. |
AD - EXTERNAL BEAM DELIVERY DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
22-Dec-2021 |
6/29/23 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.EES.02.01.01 |
Y |
Y |
28-Sep-2021 |
|
WIP CE 40Apk PS |
WIP CE 40Apk PS |
Includes M&S
and EFFORT associated with fabrication and construction of Correction Element
40Apk power supplies. Replaces 20.07.10.06. |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Muon Campus |
Muon Source |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.EES.02.01.02 |
Y |
Y |
28-Sep-2022 |
|
WIP SHUNT UPGRADE |
WIP SHUNT UPGRADE |
Includes M&S
and EFFORT associated with fabrication and construction of shunts for Proton
Source, Muon Campus and Main Injector |
AD - EE SUPPORT DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Accelerator
Operations |
Accelerator
Operations General |
C20 |
30-Sep-2022 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.MID.01.01 |
Y |
N |
28-Sep-2021 |
27-Sep-2023 |
SPS MAIN INJECTOR |
SPS MAIN INJECTOR |
Includes M&S
costs related to Main Injector Special-Process-Spare (SPS) parts and
equipment: new acquisitions (purchase or fabricated in-house) and parts and
equipment acquired by removal from service or by custody transfer. Replaces
20.14.1.1.1. |
AD - MAIN INJECTOR DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Main Injector |
Main Injector |
C20 |
22-Dec-2021 |
6/29/23 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.PSD.01.01 |
Y |
N |
28-Sep-2021 |
27-Sep-2023 |
SPS PROTON SOURCE |
SPS PROTON SOURCE |
Includes M&S
costs related to Proton Source Special-Process-Spare (SPS) parts and
equipment: new acquisitions (purchase or fabricated in-house) and parts and
equipment acquired by removal from service or by custody transfer. Replaces
20.17.1.1.1. |
AD - PROTON SOURCE DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Proton Source |
Proton Source |
C20 |
22-Dec-2021 |
6/29/23 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.RFD.01.01 |
Y |
N |
28-Sep-2021 |
27-Sep-2023 |
SPS RF DEPARTMENT |
SPS RF DEPARTMENT |
Includes M&S
costs related to RF Department Special-Process-Spare (SPS) parts and
equipment: new acquisitions (purchase or fabricated in-house) and parts and
equipment acquired by removal from service or by custody transfer. Replaces
20.18.1.2.1. |
AD - RF DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Proton Source |
Proton Source |
C20 |
22-Dec-2021 |
6/29/23 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.01.01 |
Y |
N |
28-Sep-2021 |
27-Sep-2023 |
SPS TARG SYSTEMS |
SPS TARG SYSTEMS |
Includes M&S
costs related to NOvA-NuMI and Booster Neutrino Beam Special-Process-Spare
(SPS): new acquisitions (purchase or fabricated in-house) and parts and
equipment acquired by removal from service or by custody transfer. Replaces
20.37.01.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES |
AccelOperations |
Target Systems |
External Beamlines |
C20 |
22-Dec-2021 |
6/29/23 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.01.06 |
Y |
Y |
28-Sep-2021 |
|
WIP HADM-06 |
WIP HADM-06 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Hadron Monitor HADM-06. Replaces 20.37.01.05.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.01.07 |
Y |
Y |
28-Sep-2021 |
|
WIP HADM-07 |
WIP HADM-07 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Hadron Monitor HADM-07. Replaces 20.37.01.05.03. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.02.06 |
Y |
Y |
28-Sep-2021 |
|
WIP HORN 1 PH1-06 |
WIP HORN 1 PH1-06 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI Horn
1 PH1-06. Replaces 20.37.01.06.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.02.07 |
Y |
Y |
28-Sep-2021 |
|
WIP HORN 1 PH1-07 |
WIP HORN 1 PH1-07 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI Horn
1 PH1-07. Replaces 20.37.01.06.05. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.02.08 |
Y |
Y |
28-Sep-2021 |
|
WIP HORN 1 PH1-08 |
WIP HORN 1 PH1-08 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI Horn
1 PH1-08. Replaces 20.37.01.06.06. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.03.05 |
Y |
Y |
28-Sep-2021 |
|
WIP HORN 2 PH2-05 |
WIP HORN 2 PH2-05 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI Horn
2 PH2-05. Replaces 20.37.01.06.04. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.04.06 |
Y |
Y |
28-Sep-2021 |
|
WIP TARGET TA-06 |
WIP TARGET TA-06 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Target TA-06. Replaces 20.37.01.07.03. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.04.07 |
Y |
Y |
28-Sep-2021 |
|
WIP TARGET TA-07 |
WIP TARGET TA-07 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Target TA-07. Replaces 20.37.01.07.04. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.04.08 |
Y |
Y |
28-Sep-2021 |
|
WIP TARGET TA-08 |
WIP TARGET TA-08 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Target TA-08. Replaces 20.37.01.07.05. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.04.09 |
Y |
Y |
28-Sep-2021 |
|
WIP TARGET TA-09 |
WIP TARGET TA-09 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Target TA-09. Replaces 20.37.01.07.06. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.05.04H |
Y |
Y |
28-Sep-2021 |
|
WIP MBT-04 HORN |
WIP MBT-04 HORN |
Includes M&S
and EFFORT associated with the fabrication and construction of Booster
Neutrino Beam Horn MBT-04. Replaces 20.37.01.08.01. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
MINIBooNE |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.05.04T |
Y |
Y |
28-Sep-2021 |
|
WIP MBT-04 TARGET |
WIP MBT-04 TARGET |
Includes M&S
and EFFORT associated with the fabrication and construction of Booster
Neutrino Beam Target MBT-04. Replaces 20.37.01.08.02. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
MINIBooNE |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.05.05 |
Y |
Y |
28-Sep-2021 |
|
WIP MBT-05 HORN&TARG |
WIP MBT-05
HORN&TARG |
Includes M&S
and EFFORT associated with the fabrication and construction of Booster
Neutrino Beam MBT-05 Horn and Target. Replaces 20.37.01.08.03. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
MINIBooNE |
C20 |
22-Dec-2021 |
12/19/22 |
20SPS |
AD SPECIAL-PROCESS-SPARES |
20SPS.TSD.02.06.01 |
Y |
Y |
28-Sep-2022 |
|
WIP SLB-011 |
WIP SLB-011 |
Includes M&S
and EFFORT associated with the fabrication and construction of NOvA-NuMI
Stripline Block SLB-011. |
AD - TARGET SYSTEMS DEPARTMENT |
OPERATING |
INV |
KA2202811 |
KA 22 02 811
INVENTORY - SPECIAL PROCESS SPARES |
OP-INV-SPARES-WIP |
AccelOperations |
Target Systems |
NOvA - NuMI Off
Axis Neutrino Appearance |
C20 |
20-Mar-2023 |
3/20/23 |
20MB |
Accelerator READS |
20MB.01 |
Y |
Y |
18-Nov-2020 |
|
ACCEL READS |
ACCEL READS |
Includes M&S
and EFFORT related to integrating machine learning into accelerator
operations to provide an accessible framework, dynamic tuning and real-time
accelerator control using embedded ML on-chip hardware under the direction of
Kiyomi Seiya. |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2401046 |
KA 24 01 046 GARD
- AI & ML |
OP-GARD-AI &
ML-ADD |
AccelRD |
GARD AI/ML |
Artificial
Intelligence and Machine Learning |
C20 |
08-Dec-2020 |
12/19/22 |
2108 |
Booster HLRF Sta Cntrl Upgrade |
2108.01 |
Y |
Y |
28-Sep-2022 |
|
SIMULATION AND MODEL |
SIMULATION AND
MODEL |
Includes costs
associated with performing simulations and modeling for the Booster beam
loading compensation and HLRF station controller upgrades |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C21 |
15-Mar-2023 |
3/15/23 |
2108 |
Booster HLRF Sta Cntrl Upgrade |
2108.02 |
Y |
Y |
28-Sep-2022 |
|
FW DES & VERIFY |
FW DES &
VERIFY |
Includes costs
associated with firmware design and verification for the Booster beam loading
compensation and HLRF station controller upgrades |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C21 |
15-Mar-2023 |
3/15/23 |
2108 |
Booster HLRF Sta Cntrl Upgrade |
2108.03 |
Y |
Y |
28-Sep-2022 |
|
SW PROG & CNTLS IF |
SW PROG &
CNTLS IF |
Includes costs
associated with software programming and the controls interface for the
Booster beam loading compensation and HLRF station controller upgrades |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C21 |
15-Mar-2023 |
3/15/23 |
2108 |
Booster HLRF Sta Cntrl Upgrade |
2108.04 |
Y |
Y |
28-Sep-2022 |
|
HW DES & FABRICATION |
HW DES &
FABRICATION |
Includes costs
associated with hardware design and fabrication for the Booster beam loading
compensation and HLRF station controller upgrades |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Proton Source |
Proton Source |
C21 |
15-Mar-2023 |
3/15/23 |
20C |
Contractor Clearing-HoldingAD |
20C.01 |
Y |
N |
26-Sep-2019 |
|
ContractorHldClrOBLG |
ContractorHldClrOBLG |
To commit,
monitor and track obligations and invoices for contract hires in the
Accelerator Division |
AD - SPECIAL PROJECTS |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
21-Oct-2019 |
12/19/22 |
20C |
Contractor Clearing-HoldingAD |
20C.01.CB |
Y |
N |
26-Sep-2019 |
|
ContractorHldClrCHBK |
ContractorHldClrCHBK |
To commit,
monitor and track chargebacks for contract hires in the Accelerator Division |
AD - SPECIAL PROJECTS |
OPERATING |
BURDEN |
EC0101030 |
PROGRAM SUPPORT
OVERHEAD |
OP-BURDEN-PS ALL |
Overhead |
Business
Operations |
D/S/C
Administration |
B19 |
21-Oct-2019 |
12/19/22 |
203 |
ECA - J. Jarvis |
203.01 |
Y |
Y |
01-Sep-2020 |
31-Aug-2025 |
ECA - J. Jarvis |
ECA - J. Jarvis |
Eary Career
Award: Next-Generation Beam Cooling and Control with Optical Stochastic
Cooling. Project Period 09/01/20 to 08/31/2025. PI-J. Jarvis. |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2401046 |
KA 24 01 046 GARD
- AI & ML |
OP-GARD-AI &
ML-ADD |
AccelRD |
GARD AI/ML |
Artificial
Intelligence and Machine Learning |
C20 |
26-Aug-2020 |
2/23/21 |
205 |
ECA - K. Ammigan |
205.01 |
Y |
Y |
28-Jun-2022 |
|
ECA - K. Ammigan |
ECA - K. Ammigan |
Early Career
Award: Advanced Materials to Enable Next-Generation High-Power Accelerators.
Project period 7/1/22 to 6/30/27. PI-K. Ammigan |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
AccelRD |
Particle Sources
& Targets |
High Power Target
R&D |
C20 |
06-Jul-2022 |
12/19/22 |
202 |
ECA - R. Ainsworth |
202.01 |
Y |
Y |
01-Sep-2020 |
|
ECA - R. Ainsworth |
ECA - R.
Ainsworth |
Early Career
Award: Ensuring bunch stability in multi-MW beams, Project Period 09/01/20 to
08/31/2025. PI-R. Ainsworth |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
AccelRD |
Accelerator and
Beam Physics |
Accelerator
Science General |
C20 |
26-Aug-2020 |
12/19/22 |
20LF |
Fields Horn Transfer Project |
20LF.01 |
Y |
Y |
28-Sep-2022 |
|
FIELDS HORN TRANSFER |
FIELDS HORN
TRANSFER |
INCLUDES
ACTIVITIES RELATED TO THE RELOCATION OF NUMI TARGETRY COMPONENTS (TARGET,
HORN, TEST POWER SUPPLY) FOR TEMPORARY USE IN THE EMPHATIC EXPERIMENT, AS
ORIGINALLY PROPOSED BY LAURA FIELDS. THIS TASK IS FUNDED BY $400K FROM HER
ECA. |
AD - SPECIAL PROJECTS |
OPERATING |
R&D |
KA220102 |
KA 22 01 02
INTENSITY RESEARCH - NATIONAL LABORATORIES |
OP-R&D-INTENSITY-ADD |
IntensityFront_Neutrino |
DUNE |
External Beamlines |
C20 |
18-Nov-2022 |
12/19/22 |
2106 |
MI-8 LINE COLLIMATORS UPGRADE |
2106.1 |
Y |
Y |
26-Sep-2020 |
|
MI-8 LCU-COL 825 827 |
MI-8 LCU-COL 825
827 |
INCLUDES COSTS
ASSOCIATED WITH THE IMPLEMENTATION OF THE MI-8 LINE COLLIMATORS AT LOCATIONS
825 AND 827. |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C21 |
04-Feb-2021 |
12/19/22 |
2106 |
MI-8 LINE COLLIMATORS UPGRADE |
2106.2 |
Y |
Y |
26-Sep-2020 |
|
MI-8 LCU-MSK 825 827 |
MI-8 LCU-MSK 825
827 |
INCLUDES COSTS
ASSOCIATED WITH THE IMPLEMENTATION OF THE MI-8 LINE MASKS AT LOCATIONS 825
AND 827. |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C21 |
04-Feb-2021 |
12/19/22 |
2106 |
MI-8 LINE COLLIMATORS UPGRADE |
2106.3 |
Y |
Y |
26-Sep-2020 |
|
MI-8 LCU-CTC 825 827 |
MI-8 LCU-CTC 825
827 |
INCLUDES COSTS
ASSOCIATED WITH THE IMPLEMENTATION OF THE MI-8 LINE COLLIMATOR TRIM
CORRECTORS AT LOCATIONS 825 AND 827. |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Main Injector |
Main Injector |
C21 |
04-Feb-2021 |
12/19/22 |
20MA |
ML4 LinacBDAP |
20MA.01 |
Y |
N |
18-Nov-2020 |
|
ML4 LinacBDAP |
ML4 LinacBDAP |
Includes M&S
and EFFORT related to developing and implementing real-time anomaly
detection, classification, and fault prediction for the Fermilab Linac under
the direction of William Pellico. |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2401046 |
KA 24 01 046 GARD
- AI & ML |
OP-GARD-AI &
ML-ADD |
AccelRD |
GARD AI/ML |
Artificial
Intelligence and Machine Learning |
C20 |
08-Dec-2020 |
6/22/23 |
2107 |
Mu2e TARGET HANDLING SYSTEMS |
2107.01.01 |
Y |
Y |
28-Sep-2022 |
|
TargetHandlMachines |
TargetHandlMachines |
This includes
Effort and M&S for the Target Handling Machines for the Mu2e experiment. |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Target Systems |
Mu2e - Muon to
Electron Conversion Experiment |
C21 |
31-Jan-2023 |
2/7/23 |
2107 |
Mu2e TARGET HANDLING SYSTEMS |
2107.02.01 |
Y |
Y |
28-Sep-2022 |
|
Shield Door |
Shield Door |
This includes
Effort and M&S for the Shield Door for the Mu2e experiment. |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Target Systems |
Mu2e - Muon to
Electron Conversion Experiment |
C21 |
31-Jan-2023 |
2/7/23 |
2107 |
Mu2e TARGET HANDLING SYSTEMS |
2107.03.01 |
Y |
Y |
28-Sep-2022 |
|
Vacuum Windows |
Vacuum Windows |
This includes
Effort and M&S for the Vacuum Windows for the Mu2e experiment. |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Target Systems |
Mu2e - Muon to
Electron Conversion Experiment |
C21 |
31-Jan-2023 |
2/7/23 |
2107 |
Mu2e TARGET HANDLING SYSTEMS |
2107.04.01 |
Y |
Y |
28-Sep-2022 |
|
Target Monitor |
Target Monitor |
This includes
Effort and M&S for the Target Monitor for the Mu2e experiment. |
AD - SPECIAL PROJECTS |
EQUIPMENT |
GENERAL EQ |
KA2202021 |
KA 22 02 021
INTENSITY FACILITIES - ACCELERATOR EQU |
EQ-EXST PRGM
SUPP-ACCEL |
AccelOperations |
Target Systems |
Mu2e - Muon to
Electron Conversion Experiment |
C21 |
31-Jan-2023 |
2/7/23 |
20JC |
US-JP HP Acc R&D for Neu Beams |
20JC.01 |
Y |
Y |
21-Aug-2017 |
|
US-JP HP ACCRD NEU B |
US-JP HP ACCRD
NEU B |
Includes M&S
and EFFORT associated with accelerator and beamline research and technology
development for high power neutrino beams as part of the US-Japan Science and
Technology Program in High Energy Physics under the direction of Jeffrey
Eldred. |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
AccelRD |
Accelerator and
Beam Physics |
Future Accelerator
R&D General |
C20 |
15-Aug-2017 |
12/19/22 |
20JB |
US-JP HPT Materials R&D |
20JB.01 |
Y |
Y |
21-Aug-2017 |
|
US-JP HPT MAT'LS R&D |
US-JP HPT MAT'LS
R&D |
Includes M&S
and EFFORT associated with research into advanced material studies for high
intensity proton production targets & windows as part of the US-Japan
Science and Technology Program in High Energy Physics under the direction of
Kavin Ammigan. |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
AccelRD |
Particle Sources
& Targets |
High Power Target
R&D |
C20 |
15-Aug-2017 |
12/19/22 |
20JA |
US-JP RadHard SX Hardware |
20JA.02 |
Y |
Y |
01-Jul-2018 |
|
US-JP SLOWEX H-I BMS |
US-JP SLOWEX H-I
BMS |
Includes M&S
and effort associated with research into developments in slow extraction for
higher intensity beams as part of DOE FOA# LAB 18-1802 US-Japan Science and
Technology Program in High Energy Physics under the direction of Vladimir
Nagaslaev. |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
AccelRD |
Accelerator and
Beam Physics |
Future Accelerator
R&D General |
C20 |
24-Jul-2018 |
12/19/22 |
20JE |
US-Japan J. Eldred |
20JE.01 |
Y |
Y |
01-Aug-2022 |
|
US-JP ABR&TD HP NEUB |
US-JP ABR&TD
HP NEUB |
Includes
equipment related to Accelerator and Beamline Research and Technology
Development for High-Power Neutrino Beams as part of DOE FOA# LAB 22-2607
US-Japan Science and Technology Program in HEP under the direction of Jeff
Eldred. FWP FNAL 22-27 |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
AccelRD |
Accelerator and
Beam Physics |
Future Accelerator
R&D General |
C20 |
23-Aug-2022 |
12/19/22 |
20JD |
US-Japan M/L for Linac Ops |
20JD.01 |
Y |
Y |
17-Jul-2021 |
|
US-JP ML LINAC OP/IP |
US-JP ML LINAC
OP/IP |
|
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
AccelRD |
GARD AI/ML |
Artificial
Intelligence and Machine Learning |
C20 |
22-Jul-2021 |
12/19/22 |
20JD |
US-Japan M/L for Linac Ops |
20JD.02 |
Y |
Y |
01-Aug-2022 |
|
US-JP ML L OP/IP TVL |
US-JP ML L OP/IP
TVL |
Includes travel
costs related to GARD AI/ML as part of DOE FOA# LAB 22-2607 US-Japan Science
and Technology Program in HEP under the direction of Kiyomi Seiya. FWP FNAL
22-26. |
AD - SPECIAL PROJECTS |
OPERATING |
FUTURE R&D |
KA2401046 |
KA 24 01 046 GARD
- AI & ML |
OP-GARD-AI &
ML-ADD |
AccelRD |
GARD AI/ML |
Artificial
Intelligence and Machine Learning |
C20 |
18-Aug-2022 |
12/19/22 |
20E |
USPAS |
20E.01.01 |
Y |
N |
26-Sep-2015 |
|
USPAS DIRECTOR |
USPAS DIRECTOR |
Used exclusively
to accumulate USPAS Director salary costs. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD-NO CSS |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
25-Apr-2016 |
12/19/22 |
20E |
USPAS |
20E.01.02 |
Y |
N |
26-Sep-2015 |
|
USPAS OFFICE STAFF |
USPAS OFFICE
STAFF |
Used exclusively
to accumulate USPAS office staff salary costs. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
22-Apr-2016 |
12/19/22 |
20E |
USPAS |
20E.01.03 |
Y |
Y |
26-Sep-2015 |
|
USPAS DIR TRAVEL |
USPAS DIR TRAVEL |
Used exclusively
to accumulate USPAS Director program administration travel costs. Use
20E.01.04 for USPAS office staff and IT support personnel travel costs
associated with USPAS program administration. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
22-Apr-2016 |
12/19/22 |
20E |
USPAS |
20E.01.04 |
Y |
Y |
26-Sep-2015 |
|
USPAS OFF STA TRAVEL |
USPAS OFF STA
TRAVEL |
Used exclusively
to accumulate USPAS office staff (except for the USPAS Director) and IT
support personnel travel costs associated with USPAS program administration.
Use 20E.01.03 for USPAS Director program administration travel costs. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
22-Apr-2016 |
12/19/22 |
20E |
USPAS |
20E.01.05 |
Y |
Y |
26-Sep-2015 |
|
USPAS ADMIN COSTS |
USPAS ADMIN COSTS |
Used to
accumulate administrative costs (freight, bank fees, mobile phones,
conference call/meeting charges, office supplies, software maintenance)
associated with USPAS program administration. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
22-Apr-2016 |
12/19/22 |
20E |
USPAS |
20E.01.06 |
Y |
Y |
26-Sep-2015 |
|
USPAS EQUIPMENT |
USPAS EQUIPMENT |
Used to
accumulate equipment costs (projectors, white boards, speakers, cords,
adapters, laptops) associated with USPAS program administration. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
22-Apr-2016 |
12/19/22 |
20E |
USPAS |
20E.01.07 |
Y |
Y |
26-Sep-2015 |
|
USPAS PROG EVAL SERV |
USPAS PROG EVAL
SERV |
Used to
accumulate costs associated with USPAS program evaluation services. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
22-Apr-2016 |
12/19/22 |
20E |
USPAS |
20E.14.01 |
Y |
Y |
26-Sep-2020 |
|
JAN22 USPAS TAMU-VEN |
JAN22 USPAS
TAMU-VEN |
Used to
accumulate allowable venue costs (meeting room and internet charges, bank
fees, freight, non-scholarship student meals, breaks, university credit fees)
associated with the January 2022 USPAS hosted by Texas A&M University. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.14.02 |
Y |
Y |
26-Sep-2020 |
|
JAN22 USPAS TAMU-SCH |
JAN22 USPAS
TAMU-SCH |
Used to
accumulate allowable scholarship costs (housing, meals, breaks and university
credit fees for supported students) associated with the January 2022 USPAS
hosted by Texas A&M University. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.14.03 |
Y |
Y |
26-Sep-2020 |
|
JAN22 USPAS TAMU-TCH |
JAN22 USPAS
TAMU-TCH |
Used to
accumulate allowable teaching costs (travel, hotel, MIE and honoraria for
supported instructors) associated with the January 2022 USPAS hosted by Texas
A&M University. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.14.04 |
Y |
Y |
26-Sep-2020 |
|
JAN22 USPAS TAMU-B&C |
JAN22 USPAS
TAMU-B&C |
Used to
accumulate the allowable cost of books and computers (textbook for each
student, computer software, computer rentals) associated with the January
2022 USPAS hosted by Texas A&M University. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.14.05 |
Y |
N |
26-Sep-2020 |
|
JAN22 USPAS TAMU-FEE |
JAN22 USPAS
TAMU-FEE |
Used to
accumulate credits associated with the collection of registration fees for
DOE-funded students for the January 2022 USPAS hosted by Texas A&M
University. Non-DOE funded student fees must be credited to 85.08.03. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.15.01 |
Y |
Y |
26-Sep-2020 |
|
JUN22 USPAS MSU-VEN |
JUN22 USPAS
MSU-VEN |
Used to
accumulate allowable venue costs (meeting room and internet charges, bank
fees, freight, non-scholarship student meals, breaks, university credit fees)
associated with the June 2022 USPAS hosted by Michigan State University. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.15.02 |
Y |
Y |
26-Sep-2020 |
|
JUN22 USPAS MSU-SCH |
JUN22 USPAS
MSU-SCH |
Used to
accumulate allowable scholarship costs (housing, meals, breaks and university
credit fees for supported students) associated with the June 2022 USPAS
hosted by Michigan State University. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.15.03 |
Y |
Y |
26-Sep-2020 |
|
JUN22 USPAS MSU-TCH |
JUN22 USPAS
MSU-TCH |
Used to
accumulate allowable teaching costs (travel, hotel, MIE and honoraria for
supported instructors) associated with the June 2022 USPAS hosted by Michigan
State University. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.15.04 |
Y |
Y |
26-Sep-2020 |
|
JUN22 USPAS MSU-B&C |
JUN22 USPAS
MSU-B&C |
Used to
accumulate the allowable cost of books and computers (textbook for each
student, computer software, computer rentals) associated with the June 2022
USPAS hosted by Michigan State University. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.15.05 |
Y |
N |
26-Sep-2020 |
|
JUN22 USPAS MSU-FEES |
JUN22 USPAS
MSU-FEES |
Used to
accumulate credits associated with the collection of registration fees for
DOE-funded students for the June 2022 USPAS hosted by Michigan State
University. Non-DOE funded student fees must be credited to 85.08.03. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
20-Jul-2021 |
12/19/22 |
20E |
USPAS |
20E.16.01 |
Y |
Y |
26-Sep-2021 |
|
JAN23 USPAS HSTN-VEN |
JAN23 USPAS
HSTN-VEN |
Used to
accumulate allowable venue costs (meeting room and internet charges, bank
fees, freight, non-scholarship student meals, breaks, university credit fees)
associated with the January 2023 USPAS hosted by Houston, Texas. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.16.02 |
Y |
Y |
26-Sep-2021 |
|
JAN23 USPAS HSTN-SCH |
JAN23 USPAS
HSTN-SCH |
Used to
accumulate allowable scholarship costs (housing, meals, breaks and university
credit fees for supported students) associated with the January 2023 USPAS
hosted by Houston, Texas. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.16.03 |
Y |
Y |
26-Sep-2021 |
|
JAN23 USPAS HSTN-TCH |
JAN23 USPAS
HSTN-TCH |
Used to
accumulate allowable teaching costs (travel, hotel, MIE and honoraria for
supported instructors) associated with the January 2023 USPAS hosted by
Houston, Texas. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.16.04 |
Y |
Y |
26-Sep-2021 |
|
JAN23 USPAS HSTN-B&C |
JAN23 USPAS
HSTN-B&C |
Used to
accumulate the allowable cost of books and computers (textbook for each
student, computer software, computer rentals) associated with the January
2023 USPAS hosted by Houston, Texas. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.16.05 |
Y |
N |
26-Sep-2021 |
|
JAN23 USPAS HSTN-FEE |
JAN23 USPAS
HSTN-FEE |
Used to
accumulate credits associated with the collection of registration fees for
DOE-funded students for the January 2023 USPAS hosted by Houston, Texas.
Non-DOE funded student fees must be credited to 85.08.03. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.16.06 |
Y |
N |
26-Sep-2021 |
|
JAN23 USPAS HSTN-TRF |
JAN23 USPAS
HSTN-TRF |
Used to
accumulate credits related to the transfer of allowable costs associated with
the January 2023 USPAS hosted by Houston, Texas to Non-DOE funded accounts. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
5/26/23 |
20E |
USPAS |
20E.17.01 |
Y |
Y |
26-Sep-2021 |
|
JUN23 USPAS NY-VEN |
JUN23 USPAS
NY-VEN |
Used to
accumulate allowable venue costs (meeting room and internet charges, bank
fees, freight, non-scholarship student meals, breaks, university credit fees)
associated with the June 2023 USPAS hosted by Melville, Long Island, New
York. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.17.02 |
Y |
Y |
26-Sep-2021 |
|
JUN23 USPAS NY-SCH |
JUN23 USPAS
NY-SCH |
Used to
accumulate allowable scholarship costs (housing, meals, breaks and university
credit fees for supported students) associated with the June 2023 USPAS
hosted by Melville, Long Island, New York. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.17.03 |
Y |
Y |
26-Sep-2021 |
|
JUN23 USPAS NY-TCH |
JUN23 USPAS
NY-TCH |
Used to
accumulate allowable teaching costs (travel, hotel, MIE and honoraria for
supported instructors) associated with the June 2023 USPAS hosted by
Melville, Long Island, New York. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.17.04 |
Y |
Y |
26-Sep-2021 |
|
JUN23 USPAS NY-B&C |
JUN23 USPAS
NY-B&C |
Used to
accumulate the allowable cost of books and computers (textbook for each
student, computer software, computer rentals) associated with the June 2023
USPAS hosted by Melville, Long Island, New York. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.17.05 |
Y |
N |
26-Sep-2021 |
|
JUN23 USPAS NY-FEES |
JUN23 USPAS
NY-FEES |
Used to
accumulate credits associated with the collection of registration fees for
DOE-funded students for the June 2023 USPAS hosted by Melville, Long Island,
New York. Non-DOE funded student fees must be credited to 85.08.03. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
27-Jun-2022 |
12/19/22 |
20E |
USPAS |
20E.18.01 |
Y |
Y |
26-Sep-2021 |
|
JAN24 USPAS NIU-VEN |
JAN24 USPAS
NIU-VEN |
Used to
accumulate allowable venue costs (meeting room and internet charges, bank
fees, freight, non-scholarship student meals, breaks, university credit fees)
associated with the January 2024 USPAS hosted by NIU in Hampton, VA (Jan 22 -
Feb 2, 2024) |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
07-Jun-2023 |
6/7/23 |
20E |
USPAS |
20E.18.02 |
Y |
Y |
26-Sep-2021 |
|
JAN24 USPAS NIU-SCH |
JAN24 USPAS
NIU-SCH |
Used to
accumulate allowable scholarship costs (housing, meals, breaks and university
credit fees for supported students) associated with the January 2024 USPAS
hosted by NIU in Hampton, VA (Jan 22 - Feb 2, 2024). |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
07-Jun-2023 |
6/7/23 |
20E |
USPAS |
20E.18.03 |
Y |
Y |
26-Sep-2021 |
|
JAN24 USPAS NIU-TCH |
JAN24 USPAS
NIU-TCH |
Used to
accumulate allowable teaching costs (travel, hotel, MIE and honoraria for
supported instructors) associated with the January 2024 USPAS hosted by NIU
in Hampton, VA (Jan 22 - Feb 2, 2024). |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
07-Jun-2023 |
6/7/23 |
20E |
USPAS |
20E.18.04 |
Y |
Y |
26-Sep-2021 |
|
JAN24 USPAS NIU-B&C |
JAN24 USPAS
NIU-B&C |
Used to
accumulate the allowable cost of books and computers (textbook for each
student, computer software, computer rentals) associated with the January
2024 USPAS hosted by NIU in Hampton, VA (Jan 22 - Feb 2, 2024). |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
07-Jun-2023 |
6/7/23 |
20E |
USPAS |
20E.18.05 |
Y |
N |
26-Sep-2021 |
|
JAN24 USPAS NIU-FEES |
JAN24 USPAS
NIU-FEES |
Used to
accumulate credits associated with the collection of registration fees for
DOE-funded students for the January 2024 USPAS hosted by NIU in Hampton, VA
(Jan 22 - Feb 2, 2024). Non-DOE funded student fees must be credited to
85.08.03. |
AD - ARD - USPAS OFFICE |
OPERATING |
FUTURE R&D |
KA2501012 |
KA 25 01 012
ADVANCED TECHNOLOGY - NATIONAL LABORATORIES |
OP-FUTURE
R&D-ACCEL-ADD |
USPAS |
USPAS |
Communication /
Education / Public Outreach |
C20 |
07-Jun-2023 |
6/7/23 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|